Dell PowerEdge SC1435 Rack Installation Guide - Page 35
Flush-Mount Installation - drivers
View all Dell PowerEdge SC1435 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Figure 2-4. Installing the Mounting Rails for Center-Mount Configuration 1 2 3 4 5 6 1 two-post open-frame rack 2 mounting rails (2) 2 12-24 x 0.5-inch pan-head Phillips screws (4 per rail) 4 system rails (2) 3 center-mount mounting flange 6 release latch Flush-Mount Installation The two-post rack kit is shipped with the brackets configured for a 7.62-cm (3-inch) wide center-mount installation. See Figure 2-1 for mounting rail components. To prepare the mounting rails for flush-mount installation in the two-post rack, perform the following steps: 1 Locate the two mounting rails and place them side by side on a smooth work surface, with the front ends of the mounting rails toward you (see Figure 2-5). 2 Using a 3/8-inch wrench or nut driver, remove two nuts from the adjustable mounting bracket (see Figure 2-5). Two-Post Rack Installation 33