Dell PowerStore 1200T EMC PowerStore Release Notes for PowerStore OS Version 3 - Page 8
Import workflow with Windows Host, Use Agentless / Online import instead.
View all Dell PowerStore 1200T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Issue ID MDT-190232 Functional Area Hardware MDT-263147 Hardware MDT-362662 Hardware MDT-362070 Hardware MDT-295614 Import MDT-252560 Import MDT-285903 Internal Migration MDT-140927 Internal Migration MDT-359565 Internal Migration Description Workaround/Resolution The svc_node shutdown command may Run the svc_node shutdown command reboot the node instead of powering it again when the node has finished off. rebooting. If you add an appliance to a cluster when another appliance in the cluster is powered off, the add appliance operation will fail. None A node may remain powered down after a reboot and require another reboot. Reboot the halted node again. After a dual node reboot, if one node comes up 120 seconds before the other node, the first node may reboot again to start auto-recovery. None Import workflow with Windows Host Agent may fail with import error 0xE0301002002C when there are isolated multiple storage networks configured on Powerstore. One of the following workarounds may be applied: 1. If possible, leave only one storage network configured where the Host resides. 2. Use Agentless / Online import instead. Import of a volume failed with the error "Import failed because the mirror service could not be enabled on the Destination volume". Run the verify operation on the remote system to recover data connections. Once the remote system verify operation completes successfully, try the import operation again. The migration failed due to a High Availability (HA) event and a system snapshot remains on the migration source object. Contact your service provider to clean up the remaining snapshot. After a volume is migrated, there may be a dip in capacity and performance metrics reporting for that volume at the end of the migration operation. None The PowerStore Manager (GUI) does not prevent a user from using the Delete button during a migration cutover, however, deletion during cutover is not supported and the migration session is not deleted. The delete operation will result in a backend error. None 8 Known Issues