Dell PowerStore 9000T EMC PowerStore Installation and Service Guide - Page 116
Powering on procedures for PowerStore node, Power on a PowerStore T model node using a service script
View all Dell PowerStore 9000T manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 116 highlights
Powering on procedures for PowerStore node This section includes the following procedures: • Power on a PowerStore T model node using a service script on page 116 • Power on a PowerStore T model node by reseating the node on page 116 • Power on a PowerStore X model node using a service script on page 117 • Power on a PowerStore X model node by reseating the node on page 117 Power on a PowerStore T model node using a service script Prerequisites Obtain the following information: • Management IP address of the appliance that contains the node. In PowerStore Manager, go to Settings > Networking > Networking IPs > Management. Review the Management IPs table to identify the management IP address associated with the appliance. • Service account credentials About this task Use the following procedure to power on (power up) a PowerStore T model node in scenarios such as: • You are remote and cannot reseat the node. • Node was not removed from the chassis. • Embedded module, I/O module, and 4-port card were replaced. Steps 1. Launch an SSH client, and connect to the appliance using the management IP address. Since only the peer node is powered on, you are connected directly to the peer node of the appliance. 2. Enter the username and password that is associated with the service account, and log in. 3. Run the following command: svc_node power_on 4. Wait for the node to power on. 5. Enable support notifications as described in Enable support notifications on page 128. Power on a PowerStore T model node by reseating the node About this task Use the following procedure to power on (power up) a PowerStore T model node when it was removed from the chassis: Steps 1. Reseat the node into the chassis. The node will power on automatically. 2. Reconnect the power cable. 3. Wait for the node to complete powering on. 4. Enable support notifications as described in Enable support notifications on page 128. 116 Power control procedures