Dell PowerStore 9000T EMC PowerStore Installation and Service Guide - Page 52

Power up the node, Verify the operation of a replacement part, Return a faulted part

Page 52 highlights

Figure 53. Installing an I/O module 2. When the I/O module appears seated, push and release the small button on the handle. • If the button remains in, the module is fully seated. • If the button springs back, gently push the module further into the chassis, then push it again. • If the button still does not rest flush with its handle, remove the module and repeat steps 1 and 2. Figure 54. Locking in the I/O module 3. Connect the cables into the assigned I/O module ports. Power up the node Power up the node as described in Power control procedures. Verify the operation of a replacement part Steps 1. From PowerStore Manager, select Hardware. 2. Select the appliance where you replaced the faulted part. 3. From the Hardware card, select the view of the system where the part was replaced. The status of the replacement part should read Healthy. If the status is still Faulted, wait a few minutes and refresh PowerStore Manager. If the status does not change, ensure that the part is correctly seated, or contact your service provider. Return a faulted part About this task For US customers, return defective material within five business days. For International customers, return defective material within 10 business days. The materials required to return your defective part are supplied with the good part shipment. 52 Base enclosure service procedures

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129

Figure 53. Installing an I/O module
2.
When the I/O module appears seated, push and release the small button on the handle.
If the button remains in, the module is fully seated.
If the button springs back, gently push the module further into the chassis, then push it again.
If the button still does not rest flush with its handle, remove the module and repeat steps 1 and 2.
Figure 54. Locking in the I/O module
3.
Connect the cables into the assigned I/O module ports.
Power up the node
Power up the node as described in
Power control procedures
.
Verify the operation of a replacement part
Steps
1.
From PowerStore Manager, select
Hardware
.
2.
Select the appliance where you replaced the faulted part.
3.
From the
Hardware
card, select the view of the system where the part was replaced.
The status of the replacement part should read
Healthy
. If the status is still
Faulted
, wait a few minutes and refresh PowerStore
Manager. If the status does not change, ensure that the part is correctly seated, or contact your service provider.
Return a faulted part
About this task
For US customers, return defective material within five business days. For International customers, return defective material within 10
business days. The materials required to return your defective part are supplied with the good part shipment.
52
Base enclosure service procedures