Dell S6000 Dell Networking Installation Guide - Page 23
Installing the Dell ReadyRails System
View all Dell S6000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
• Reduced air flow - Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not compromised. • Reliable earthing - Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: use of power strips. • Do not mount the equipment with the rear panel facing in the downward position. Installing the Dell ReadyRails System The ReadyRails rack mounting system is provided to easily configure your rack for installation of your S6000 system. You can install the ReadyRails system using the 1U tool-less method or one of three possible 1U tooled methods (two-post flush mount, two-post center mount, or four-post threaded). Step Task 1 With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the rear flange rail pegs in the rear vertical post flange. In Figure 4-1, item 1 and its extractions show how the pegs appear in both the square and non-threaded round holes. Figure 4-1. 1U Tool-less Configuration 2 Align and seat the front flange pegs in the holes on the front side of the vertical post. Refer to Figure 4-1, item 2. 3 Repeat this procedure for the second rail. 4 To remove each rail, pull on the latch release button on each flange ear and unseat each rail. Refer to Figure 4-1, item 3. Install the S6000 | 23