Dell S6000 Dell Networking Installation Guide - Page 24
Configuring a Two-Post Flush-Mount, Two-Post Flush-Mount Configuration
View all Dell S6000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
www.dell.com | support.dell.com Configuring a Two-Post Flush-Mount Step Task 1 For this configuration, remove the castings from the front side of each ReadyRails assembly. Refer to Figure 4-2, item 1. To remove the two screws from each front flange ear (on the switch side of the rail) and remove each casting, use a Torx driver. Retain the castings for future rack requirements. It is not necessary to remove the rear flange castings. Figure 4-2. Two-Post Flush-Mount Configuration 2 Attach one rail to the front post flange with two user-supplied screws. Refer to Figure 4-2, item 2. 3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws. Refer to Figure 4-2, item 3. 4 Repeat this procedure for the second rail. 24 | Install the S6000