Dell Z9264F-ON EMC PowerSwitch Installation Guide March 2022 - Page 20

Four-post rack assembly, Rack-mounted switch for shipment

Page 20 highlights

Figure 11. Ground lug assembly attached 8. Attach the other end of the ground wire to your rack ground point. 9. Install your switch into your rack using the Z9264F-ON installation instructions. Four-post rack assembly Due to the chassis weight, the Z9264F-ON switch does not support a two-post rack installation; you must install the switch in a four-post rack. To install in a four-post rack, follow the instructions in your rack frame kit. In a four-post rack, the maximum distance between the front and back vertical posts is 36 inches (91.44 cm); the minimum distance is 24 inches (60.96 cm). Rack-mounted switch for shipment Before you install the Z9264F-ON switch in a rack that you intend to ship, you must first remove the tool-less feature from each end of both Dell EMC rack rails. CAUTION: Use two people, an equipment lift, or pallet jack when lifting or moving the chassis. Install the chassis into the rack before inserting the chassis components. Lift the chassis only from the bottom. Lifting by the chassis shelves or power supply openings might damage the chassis. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. You will need eight user-supplied rack rail screws to complete this procedure. To install a switch in a rack that you intend to ship: 1. Separate each rail assembly by sliding the inside rail out of the outside rail. 2. Unscrew the tool-less feature pins from each end of both rack rails. Use a standard slotted screw driver to remove the tool-less feature pins. In this illustration, the tool-less feature pins are on the right side of the rail and the tool-less feature is on the left side of the rail. 20 Z9264F-ON switch installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Figure 11. Ground lug assembly attached
8.
Attach the other end of the ground wire to your rack ground point.
9.
Install your switch into your rack using the Z9264F-ON installation instructions.
Four-post rack assembly
Due to the chassis weight, the Z9264F-ON switch does not support a two-post rack installation; you must install the switch in a
four-post rack.
To install in a four-post rack, follow the instructions in your rack frame kit. In a four-post rack, the maximum distance between
the front and back vertical posts is 36 inches (91.44 cm); the minimum distance is 24 inches (60.96 cm).
Rack-mounted switch for shipment
Before you install the Z9264F-ON switch in a rack
that you intend to ship
, you must first remove the tool-less feature from
each end of both Dell EMC rack rails.
CAUTION:
Use two people, an equipment lift, or pallet jack when lifting or moving the chassis. Install the
chassis into the rack before inserting the chassis components. Lift the chassis only from the bottom. Lifting by
the chassis shelves or power supply openings might damage the chassis.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
You will need eight user-supplied rack rail screws to complete this procedure.
To install a switch in a rack that you intend to ship:
1.
Separate each rail assembly by sliding the inside rail out of the outside rail.
2.
Unscrew the tool-less feature pins from each end of both rack rails.
Use a standard slotted screw driver to remove the tool-less feature pins.
In this illustration, the tool-less feature pins are on the right side of the rail and the tool-less feature is on the left side of the
rail.
20
Z9264F-ON switch installation