GE AZ41E12DAB Owners Manual - Page 19
Installation Instructions, OPTIONAL-DRAIN KIT INSTALLATION
View all GE AZ41E12DAB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Installation Instructions OPTIONAL-DRAIN KIT INSTALLATION Dry Air 25 Series models are designed to improve dehumidification by 25%. Since more moisture will be removed from the air, there is a greater possibility that water will drip from the wall case than with a standard unit. To prevent this water from dripping onto external building walls, we recommend the use of RAD10 Drain Kit. External Drain See the Installation Instructions in the RAD10 kit. Alternate: 6" long, 1/2" O.D. straight copper tube 1/2" O.D. drain tube Square drain holes Neoprene sponge gasket Steel mounting plate Type "A" screw for metal case or Type "B" screw for molded case Internal Drain See the Installation Instructions in the RAD10 kit. (The drain is located under the cabinet) Square drain holes Neoprene sponge gasket Steel mounting plate Type "A" screw for metal case or Type "B" screw for molded case 19