GE P2S975SEPSS Installation Instructions - Page 6
Installation Instructions, GAS CONNECTIONS - manual
UPC - 084691199236
View all GE P2S975SEPSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Installation Instructions GAS CONNECTIONS 10 MAKING THE CONNECTIONS 3″ 15″ 7″ 31⁄2″ 12″ A Install a manual shut-off valve in the gas supply line in an easily accessible location. B Know how and where to shut off the gas supply to the range. C Shut off gas supply before removing an old range. Leave it off until hookup of new range is finished. D Because solid pipe restricts moving the range, we recommend use of a C.S.A. certified flexible metal appliance connector. WARNING: Never reuse old flexible connectors. The use of old flexible connectors can cause gas leaks and personal injury. Always use new flexible connectors when installing a gas appliance. Gas supply to top burner Pressure regulator as seen from front of range 10 MAKING THE CONNECTIONS (cont.) E Install 1/2″ flare union adaptor to the 1/2″ NPT elbow on pressure regulator. F Connect flexible appliance connector to flare union. G Move range into approximate position and connect flexible connector to gas supply line with proper flare union adaptor. Shut-off valve Flexible gas line 7″ Max. Pressure regulator Gas supply line 90° street elbow H To prevent gas leaks, put a pipe joint sealant or Teflon® tape on all male threads. NOTE: Make sure sealant or tape is compatible with Natural and LP gases. I When you are finished making connections, be sure that all range knobs are turned to OFF before you open the main gas supply valve. WARNING: Do not use a flame to check for gas leaks. Use liquid leak detector at all joints and connections to check for leaks in the system. Gas Inlet NOTE: When screwing on the flare union adaptor, hold the gas inlet firmly with a wrench. 6