GE PDW7900P Installation Instructions - Page 5

<caution

Page 5 highlights

Installation Instructions PREPARE HOT WATER LINE • The line mug enter from either side. rear or floor within the shaded urea shown in Figure F. • The line may pass through the some hole as the electrical cable and drain hose. Or, cut on additional 1-1/2" diameter hole to accommodate the water fine. If power cord with plug is used, water line must not pass through power cord hole. STEP 2-CHECK DOOR BALANCE o With dishwasher on the wood skid, check the door balance bg opening and closing the door. • If the door drops when released, increase the spring tension. If the door rises when released, decrease ttne tension. Note: Increase or decrease tension as shown. Adjust both springs to the some tension setting to correct balance. Increase Spring • Tens,onA _'l "".., ::::i:_.;;' }:_ ! '\ /::::i/ IY_ t Insert Hook t __:, ; _::_, /_::_ lOver Bracket f_t:_ _ / : / : _k_J / i i Shut-. HOt:_...V...a...l.v. e i_.::::.:'::. CFarboimnet _ !9" From Wall :: / Cobinet Foce-_- FigureF _L[/_ 2,,From Fioor Water Line Connection °Turn off the water supply. ° Install o hand shut-off valve in on accessible locution, such us under the sink. (OptionoI, but strongly recommended and may be required by local codes.} , Water connection is on the left side of the dishwasher. Install the hot water inlet line, using no less than 3/8" copper tubing. Route the line as shown in Figure F and extend forward at least 197from rear woti .... o Adjust water heater for 120°Fto 150°Ftemperature. ,:Flush water line to clean out debris. : ,The ho:twater supply line pressure must be 20-120 PSI. :

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

Installation
Instructions
PREPARE HOT WATER
LINE
• The line mug enter from
either
side. rear or floor within
the
shaded
urea shown
in Figure F.
• The line may pass through
the some hole as the electrical
cable
and drain hose. Or, cut on additional
1-1/2"
diameter
hole to accommodate
the water
fine. If power
cord with
plug
is used, water
line must not pass through
power cord hole.
ii Shut-.
_ Valve
_.:.:.
HOt:
...........
i
::::':
From
_
Cabinet
!9" From Wall
::
/
_L[/_
2,,From Fioor
Cobinet Foce-_-
Figure
F
Water
Line Connection
°
Turn off the water supply.
° Install o hand shut-off valve in on accessible locution, such
us under the sink. (OptionoI, but strongly recommended and
may be required by local codes.}
, Water connection is on the left side of the dishwasher. Install
the hot water inlet line, using no less than 3/8" copper tubing.
Route the line as shown in Figure F and extend forward at
least 197from rear woti
....
oAdjust water heater for 120°Fto 150°Ftemperature.
,:Flush water line to clean out debris.
:
,The ho:twater supply line pressure must be 20-120 PSI.
:<CAUTION:
:Do not remove wood bose until you are readg to install the
dishwasher. The dishwasher wilt tip aver when the door is opened
if the wood bose is removed,
STEP 1-PREPARATION
:
.........
Locate the items in the installation
package
and set aside for
use in the listed steps:
Screw kit-
Steps 5 or 18 and15
:
Side mount
kit (some modelsi
- Step 12
Junction
box cover - Step 5 or 18
Drain
lnose and clamp :- Step 7
Trim PieCes {some models) - Step tl
Owner's
Hanuot
- Steps !9 and 22
Product
Samples and/or
coupons
- Step 22
STEP 2-CHECK
DOOR
BALANCE
o With dishwasher
on the wood
skid, check the door balance
bg opening
and closing the door.
• If the door drops when
released, increase
the spring
tension.
If the door rises when
released, decrease
ttne tension.
Note:
Increase
or decrease
tension
as shown. Adjust both springs
to the some tension
setting
_'l
""..,
to correct
balance.
::::i:_.;;'
}:_ !
'\
/::::i/
IY_ t
Insert
Hook
Increase
t
/_::_
lOver
Bracket
Spring
__:,
f_t:_
_
/
;
_::_,
:
/
:
Tens,onA
_k_J
/
Decreos
Correct:
Spring
/
,"::::P
7
. ......
./
Tens
on
V
./
:::
/
/::___.
_
_
__'
_
incorrect
"/"
.....
,
Figure G
Tip: If door spring adjustment is necessorg, check door
opening and closing, if door does not open easilg or falls too
quicklg, check spring cable routing. The cable is held in ptace
by "shoulders" on the pulleg. Check to be sure cable has not
slipped over the pulley shoulders.
STEP 3-REMOVE
WOOD
BASE,
INSTALL
LEVELING
LEGS
IMPORTANT'oo
not
kick offwood
base! Damage
will
occur.
. Hove the dishwasher
close to the installation
location
and lay
it on its back.
• Remove the four
leveling
legs on the underside
of the wood
bose with
on adjustable
wrench
or 15/16" socket,
• Discard
base.
Figure
H
o Screw leveling
legs buck into the dishwasher
frame,
uppro×imotelg
1/8" from flume
as shown.