Hayward Pro Logic® Models: PL-PS-4 PL-PS-8 PL-PS-16 PL-PS-16V Installatio - Page 15
Electrical Wiring - pro logic controls
View all Hayward Pro Logic® manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
4. Electrical Wiring Remote Display/Keypad Connector Wireless Base Receiver Connector 4 Temp Sensor Inputs External Input Interlock 2 Heater Outputs 4 Valve Connectors Flow Switch Connector Cell Connector 4 wire connection between PS-16 and -EXP AQL-CHEM Connector "Local" Display 8 High Voltage Relays for PS-8, PS-16 (4 relays for PS-4) 4 Valve Connectors 8 High Voltage Relays To PS-16 Display/Keypad Connector For use with PS-16 only 10 9 8 7 Control Power Input Subpanel N L2 L1 Control Power Input pH Dispense Output Subpanel Ground Bus Bar Ground Bus Bar N L2 L1 Bonding Lug(s) Expansion Unit (AQL-PS-16 only) Bonding Lug(s) The Pro Logic Control Center and PS-16 Expansion Unit require both high and low voltage connections. Low voltage connections will be made to actuators, sensors, remote keypad, etc. High voltage connections will be made to pumps, lights, etc., as well as providing direct input power to the Control Center. Always: -Ensure that Power is disconnected prior to doing any wiring -Follow all local and NEC (CEC if applicable) codes -Use copper conductors only Main Service (Power to the Circuit Breaker Subpanel) The Pro Logic circuit breaker subpanel is rated for 100A service. Run properly rated conductors (L1, L2, N, and ground) from the primary house electrical panel to the main power connections on the Pro Logic circuit breaker base. The connection at the main house panel should be to a 240VAC circuit breaker rated at 100A maximum. Grounding and Bonding Connect a ground wire from the primary electrical panel to the Pro Logic ground bus bar. Also ground each piece of high voltage (120 or 240VAC) equipment that is connected to the Pro Logic control relays or circuit breakers. The Pro Logic should also be connected to the pool bonding system by an 8AWG (6AWG for Canada) wire. A lug for bonding (2 for Canada) is provided on the outside/bottom of the Pro Logic enclosure. Circuit Breaker Installation and Wiring Circuit breakers are to be supplied by the installer. See the chart below for a list of suitable circuit breakers that can be used. Follow the code and the circuit breaker manufacturer's rating requirements regarding the size and temperature rating for wiring. Note that some pool equipment may be required to be connected to ground fault circuit breakers-check local and NEC (CEC) codes. Manufacturer SUITABLE LISTED BREAKERS Single Double Twin Quad GFCB Tightening Filler Plates Torque Cutler-Hammer BR Murray MP-T Siemens QP Square D HOM Thomas & Betts TB G.E. THQL BR MP-T QP HOM TB THQL BRD MH-T QT HOMT TBBD BRD MH-T QT HOMT TBBQ GFCB MP-GT QPF HOM-GFI GFB THQL-GF BRFP LX100FP QF3 HOMFP FP-1C-TB TFH 25lb-in 25lb-in 25lb-in 25lb-in 25lb-in 25lb-in General Purpose Outlet If desired, a duplex receptacle with weatherproof cover (supplied by installer) may be installed in the knockouts on the lower right side of the Pro Logic enclosure. Per code, the receptacle should be a GFCI type. Alternatively, connect a standard receptacle to a GFCB. 12