Hayward Universal H-Series Low NOx Service/Installation: H150FDN H200FDN H25 - Page 23
Very Important, High Pressure Propane Gas Pipe Sizing First Stage, Low Pressure Propane Gas Pipe - p & s heater 400
View all Hayward Universal H-Series Low NOx manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
23 It is VERY IMPORTANT when installing a propane heater on a 2-stage regulation system to follow the gas line sizing chart below without exception. HIGH PRESSURE PROPANE GAS PIPE SIZING "FIRST STAGE": (Based upon an inlet gas pressure of 10 psig at a pressure drop of 1 psi) Distance from Tank Regulator Outlet to Heater Gas Valve Inlet Model btu/hr input Line Material H150FDP 150,000 Iron Pipe Tubing 0 to 50 ft 1/2" 1/2" H200FDP 200,000 Iron Pipe Tubing 1/2" 1/2" H250FDP 250,000 Iron Pipe Tubing 1/2" 1/2" H300FDP 300,000 Iron Pipe Tubing 1/2" 1/2" H350FDP 350,000 Iron Pipe Tubing 1/2" 1/2" H400FDP 400,000 Iron Pipe Tubing 1/2" 1/2" 50 to 100 ft 100 to 150 ft 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 5/8" 1/2" 5/8" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 1/2" 5/8" 1/2" 5/8" 1/2" 5/8" LOW PRESSURE PROPANE GAS PIPE SIZING "SECOND STAGE": (Based upon an inlet gas pressure of 11 in-wc at a pressure drop of 0.5 in-wc) Distance from Outlet of 2nd Stage Regulator to Heater Gas Valve Inlet Model btu/hr input Line Material H150FDP 150,000 Iron Pipe Tubing 0 to 10 ft 1/2" 5/8" H200FDP 200,000 Iron Pipe Tubing 1/2" 5/8" H250FDP 250,000 Iron Pipe Tubing 1/2" 3/4" H300FDP 300,000 Iron Pipe Tubing 3/4" 3/4" H350FDP 350,000 Iron Pipe Tubing 3/4" 7/8" H400FDP 400,000 Iron Pipe Tubing 3/4" 7/8" USE ONLY HAYWARD GENUINE REPLACEMENT PARTS Pomona, CA Clemmons, NC Nashville, TN Tel: 908-351-5400 www.haywardpool.com