HP LH4r HP Netserver LH 3000 Rack Cabling Guide - Page 65

Index

Page 65 highlights

Index A air flow in the rack, 30 C Cable Guide ensure installed, 31 cable inventory preparation checklist, 4 cable management ensure the the Cable Guide is in place, 31 mount the Cable Management Arm, 31 planning for, 29 power cords within occupied area, 38 power cords within same EIA unit, 38 Cable Management Arm ensure installed, 31 cable routing cabling guidelines for the LH 3000r, 32 guidelines for server and peripheral connections, 37 overview of guidelines, 29 overview of procedure, 12 cabling SCSI cables from LH 3000r to Rack Storage/12, 32 capacity power block diagram, 50 circuit breakers site preparation, 4 configuring the system cabling to prepare for, 32 connecting electrical power unterminated power cords, 5 D data cables attach to components, 37 attach to server, 35 overview, 32 dual power supply configuration, 49 E electrical current requirements 100 VAC table of devices, 25 120 VAC table of devices, 26 200/208 VAC table of devices, 27 230/240 VAC table of devices, 28 F fan not required for perforated doors, 10 floor preparation checklist, 3 H hardware configuration preparation checklist, 4 high density configuration, 50 HP Console Switch use with LH 3000r, 32 HP NetServer LH 3000r cords, plugs, and receptacles, 17 voltages, 16 HP Rack Assistant, 29 M multiple rack bays tie together kit, 9 O operating environment checklist, 4 overview cabling the assembled rack, 12 data cabling, 32 P PDU. See Power Distribution Unit placement limitations 61

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67

61
Index
A
air flow in the rack, 30
C
Cable Guide
ensure installed, 31
cable inventory
preparation checklist, 4
cable management
ensure the the Cable Guide is in
place, 31
mount the Cable Management Arm,
31
planning for, 29
power cords within occupied area, 38
power cords within same EIA unit,
38
Cable Management Arm
ensure installed, 31
cable routing
cabling guidelines for the LH 3000r,
32
guidelines for server and peripheral
connections, 37
overview of guidelines, 29
overview of procedure, 12
cabling
SCSI cables from LH 3000r to Rack
Storage/12, 32
capacity
power block diagram, 50
circuit breakers
site preparation, 4
configuring the system
cabling to prepare for, 32
connecting electrical power
unterminated power cords, 5
D
data cables
attach to components, 37
attach to server, 35
overview, 32
dual power supply configuration, 49
E
electrical current requirements
100 VAC table of devices, 25
120 VAC table of devices, 26
200/208 VAC table of devices, 27
230/240 VAC table of devices, 28
F
fan not required for perforated doors, 10
floor preparation
checklist, 3
H
hardware configuration
preparation checklist, 4
high density configuration, 50
HP Console Switch
use with LH 3000r, 32
HP NetServer LH 3000r
cords, plugs, and receptacles, 17
voltages, 16
HP Rack Assistant, 29
M
multiple rack bays
tie together kit, 9
O
operating environment
checklist, 4
overview
cabling the assembled rack, 12
data cabling, 32
P
PDU.
See
Power Distribution Unit
placement limitations