HP ML530 ProLiant ML530 Generation 2 Server Setup and Installation Guide - Page 150

Preparing the Rack for Server Installation, Measuring with the Template

Page 150 highlights

Installing the Rack Server 5. With the exception of additional memory and most PCI-X boards, run the ROM-Based Setup Utility (RBSU) after you install your hardware options. To run RBSU, refer to the ProLiant Essentials Foundation Pack that ships with your server. 6. Use the rack template to identify the proper location for the server. See "Measuring with the Template" in this chapter. 7. Attach rack-mounting hardware to the server and to the rack. See "Installing the Rack Rail Assemblies" and "Attaching the Cable Management Arm Bracket" in this chapter. 8. Slide the server into the rack. See "Installing the Server into the Rack" in this chapter. 9. Attach the cable management arm to its support bracket. Attach the optional cable management arm support bracket to the back of the rack. Preparing the Rack for Server Installation To prepare the rack for a server installation: • Measure with the rack template. • Insert cage nuts into the rack frame. • Install the rack rail assemblies. Measuring with the Template The rack template provides an easy and reliable way to properly position the rack rail assemblies in the rack. • The template is two-sided and is printed with arrows that show you where to insert rack rail assemblies on the front and back of the rack. • The template determines the mounting position of the rack rail assemblies and the cage nuts (supplied with the rack kit) that secure the rack bezel to the rack after installation. HP ProLiant ML530 Generation 2 Server Setup and Installation Guide 5-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295

Installing the Rack Server
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
5-3
5.
With the exception of additional memory and most PCI-X boards, run the
ROM-Based Setup Utility (RBSU) after you install your hardware options. To
run RBSU, refer to the ProLiant Essentials Foundation Pack that ships with your
server.
6.
Use the rack template to identify the proper location for the server. See
“Measuring with the Template” in this chapter.
7.
Attach rack-mounting hardware to the server and to the rack. See “Installing the
Rack Rail Assemblies” and “Attaching the Cable Management Arm Bracket” in
this chapter.
8.
Slide the server into the rack. See “Installing the Server into the Rack” in this
chapter.
9.
Attach the cable management arm to its support bracket. Attach the optional
cable management arm support bracket to the back of the rack.
Preparing the Rack for Server Installation
To prepare the rack for a server installation:
Measure with the rack template.
Insert cage nuts into the rack frame.
Install the rack rail assemblies.
Measuring with the Template
The rack template provides an easy and reliable way to properly position the rack rail
assemblies in the rack.
The template is two-sided and is printed with arrows that show you where to
insert rack rail assemblies on the front and back of the rack.
The template determines the mounting position of the rack rail assemblies and
the cage nuts (supplied with the rack kit) that secure the rack bezel to the rack
after installation.