HP ML530 ProLiant ML530 Generation 2 Server Setup and Installation Guide - Page 153

Inserting Cage Nuts into the Rack Frame

Page 153 highlights

Installing the Rack Server 3. Secure the template against the rear of the rack by pressing the two push tabs through the matching holes. 4. Use a pencil to mark the locations on the inside of the rear of the rack where the rack rails must be inserted (designated "R" on the template). Also mark the locations for the cable management arm (designated "A" on the template) on the outside of the rack. IMPORTANT: On the rear of the rack, make pencil marks on the inside of the vertical rails. These markings guide you in installing rack rails into the interior of the rack frame. NOTE: No cage nuts are required on the rear vertical posts of the rack. 5. Place additional pencil marks on the rack at the top edge of the template to align the template for the next component. After marking the front and rear of the rack, remove the template from the rack and prepare the rack for installation. Inserting Cage Nuts into the Rack Frame Having marked the positions for the cage nuts in the front of the rack, insert cage nuts on the inside of the rack posts at the marked locations. To insert the cage nuts: 1. Position one of the cage nuts on the inside of a vertical post on the front of the rack. 2. Compress the sides of the cage nut and insert both tabs into the square cutout on the post. 5-6 HP ProLiant ML530 Generation 2 Server Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295

Installing the Rack Server
5-6
HP ProLiant ML530 Generation 2 Server Setup and Installation Guide
3.
Secure the template against the rear of the rack by pressing the two push tabs
through the matching holes.
4.
Use a pencil to mark the locations on the inside of the rear of the rack where the
rack rails must be inserted (designated “R” on the template). Also mark the
locations for the cable management arm (designated “A” on the template) on the
outside of the rack.
IMPORTANT:
On the rear of the rack, make pencil marks on the
inside
of the vertical
rails. These markings guide you in installing rack rails into the interior of the rack frame.
NOTE:
No cage nuts are required on the rear vertical posts of the rack.
5.
Place additional pencil marks on the rack at the top edge of the template to align
the template for the next component.
After marking the front and rear of the rack, remove the template from the rack and
prepare the rack for installation.
Inserting Cage Nuts into the Rack Frame
Having marked the positions for the cage nuts in the front of the rack, insert cage nuts
on the inside of the rack posts at the marked locations.
To insert the cage nuts:
1.
Position one of the cage nuts on the inside of a vertical post on the front of
the rack.
2.
Compress the sides of the cage nut and insert both tabs into the square cutout on
the post.