HP Tc4100 Hewlett-Packard VA 7100/7400 Microsoft Cluster Services Installation - Page 41
Cluster Setup, Introduction, Preliminary Operations
![]() |
View all HP Tc4100 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 41 highlights
6 Cluster Setup VA 7100/7400 Cluster Installation Guide Introduction This chapter provides detailed instructions for performing the cluster setup. Preliminary Operations The following preliminary operations must be successfully completed before beginning the Cluster Setup Procedure. 1. Ensure that all requirements detailed in chapters 2 through 5 have been thoroughly reviewed and successfully completed. 2. Ensure that storage array is powered up and maintained in accordance with the procedure of chapter 3. 3. Ensure that node 1 is powered up and running. 4. Ensure that node 2 is powered up but in Pause mode. Refer to step 16 of the Configuration Procedure of chapter 5. 5. Ensure that the cluster Configuration Worksheet located in Appendix A has been completely filled out. 6. On the node 1 Windows 2000 Configure Your Server window shown below, click Finish setup. 10/12/01 38
![](/manual_guide/products/hewlettpackard-lh3000r-hewlettpackard-va-71007400-microsoft-cluster-services-installation-guide-hp-netservers-636f2c5/41.png)