IBM 88632SU User Manual - Page 35
Installing, hot-swap, power, supply
View all IBM 88632SU manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Top cover Cover release latch Bezel xSerier 365 4. Lift the cover-release latch. The cover slides to the rear approximately 13 mm (0.5 inch). Lift the cover off the server. Attention: For proper cooling and airflow, replace the top cover before turning on the server. Operating the server for more than 2 minutes with the top cover removed might damage server components. 5. Press on the bezel retention tabs at the top edge of the bezel, and pull the top of the bezel slightly away from the server. 6. Lift the bezel up to release the two tabs at the bottom edge of the bezel. Installing a hot-swap power supply The following notes describe information that you must consider when installing a hot-swap power supply in the server: v The server comes with a minimum of one power supply and supports up to two power supplies (hot-swappable at 220 V ac only). v The power supplies are numbered from left to right (1 and 2) as viewed from the rear of the server. Power supplies must be installed in the following sequence: power supply 1, then power supply 2. v A single 110 V ac power supply can support a maximum configuration of 1 microprocessor, 2 PCI adapters, 3 hard disk drives, and 4 DIMMs. If you exceed this configuration you must either install a second power supply or use 220 V ac input. v If you install or remove a power supply, observe the following precautions: Statement 8: Chapter 2. Installing options 23