IBM HS20 User Guide - Page 49
Completing, installation
![]() |
UPC - 087944983033
View all IBM HS20 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 49 highlights
8. Close the blade server cover (see "Closing the blade server cover" on page 36). Statement 21: CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 9. Reinsert the blade server into the bay in the BladeCenter unit. 10. Turn on the blade server. 11. Start the blade server Configuration/Setup Utility program and set configuration parameters as needed (see "Using the Configuration/Setup Utility program" on page 43 for information). Completing the installation To complete the installation, complete the following tasks. Instructions for each task are in the following sections. 1. Reinstall the blade server bezel assembly, if you removed it (see "Installing the blade server bezel assembly" on page 36). 2. Close the blade server cover, unless you installed an expansion unit option (see "Closing the blade server cover" on page 36). Statement 21: CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 3. Reinstall the blade server into the BladeCenter unit (see "Installing the blade server in the BladeCenter unit" on page 37). 4. Turn on the blade server (see "Turning on the blade server" on page 15). 5. For certain options, run the blade server Configuration/Setup Utility program (see "Updating your blade server configuration" on page 40). Note: If you have just connected the power cords of your BladeCenter unit to electrical outlets, you must wait until the power-on LED on the blade server flashes slowly before pressing the power-control button on a blade server. Chapter 3. Installing options 35
![](/manual_guide/products/ibm-hs20-user-guide-e2f550c/49.png)