IBM HS20 User Guide - Page 49

Completing, installation

Page 49 highlights

8. Close the blade server cover (see "Closing the blade server cover" on page 36). Statement 21: CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 9. Reinsert the blade server into the bay in the BladeCenter unit. 10. Turn on the blade server. 11. Start the blade server Configuration/Setup Utility program and set configuration parameters as needed (see "Using the Configuration/Setup Utility program" on page 43 for information). Completing the installation To complete the installation, complete the following tasks. Instructions for each task are in the following sections. 1. Reinstall the blade server bezel assembly, if you removed it (see "Installing the blade server bezel assembly" on page 36). 2. Close the blade server cover, unless you installed an expansion unit option (see "Closing the blade server cover" on page 36). Statement 21: CAUTION: Hazardous energy is present when the blade server is connected to the power source. Always replace the blade cover before installing the blade server. 3. Reinstall the blade server into the BladeCenter unit (see "Installing the blade server in the BladeCenter unit" on page 37). 4. Turn on the blade server (see "Turning on the blade server" on page 15). 5. For certain options, run the blade server Configuration/Setup Utility program (see "Updating your blade server configuration" on page 40). Note: If you have just connected the power cords of your BladeCenter unit to electrical outlets, you must wait until the power-on LED on the blade server flashes slowly before pressing the power-control button on a blade server. Chapter 3. Installing options 35

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112

8.
Close
the
blade
server
cover
(see
“Closing
the
blade
server
cover”
on
page
36).
Statement
21:
CAUTION:
Hazardous
energy
is
present
when
the
blade
server
is
connected
to
the
power
source.
Always
replace
the
blade
cover
before
installing
the
blade
server.
9.
Reinsert
the
blade
server
into
the
bay
in
the
BladeCenter
unit.
10.
Turn
on
the
blade
server.
11.
Start
the
blade
server
Configuration/Setup
Utility
program
and
set
configuration
parameters
as
needed
(see
“Using
the
Configuration/Setup
Utility
program”
on
page
43
for
information).
Completing
the
installation
To
complete
the
installation,
complete
the
following
tasks.
Instructions
for
each
task
are
in
the
following
sections.
1.
Reinstall
the
blade
server
bezel
assembly,
if
you
removed
it
(see
“Installing
the
blade
server
bezel
assembly”
on
page
36).
2.
Close
the
blade
server
cover,
unless
you
installed
an
expansion
unit
option
(see
“Closing
the
blade
server
cover”
on
page
36).
Statement
21:
CAUTION:
Hazardous
energy
is
present
when
the
blade
server
is
connected
to
the
power
source.
Always
replace
the
blade
cover
before
installing
the
blade
server.
3.
Reinstall
the
blade
server
into
the
BladeCenter
unit
(see
“Installing
the
blade
server
in
the
BladeCenter
unit”
on
page
37).
4.
Turn
on
the
blade
server
(see
“Turning
on
the
blade
server”
on
page
15).
5.
For
certain
options,
run
the
blade
server
Configuration/Setup
Utility
program
(see
“Updating
your
blade
server
configuration”
on
page
40).
Note:
If
you
have
just
connected
the
power
cords
of
your
BladeCenter
unit
to
electrical
outlets,
you
must
wait
until
the
power-on
LED
on
the
blade
server
flashes
slowly
before
pressing
the
power-control
button
on
a
blade
server.
Chapter
3.
Installing
options
35