IBM LS41 User Guide - Page 29
Installing, options - firmware download
UPC - 883436021159
View all IBM LS41 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 29 highlights
Chapter 3. Installing options This chapter provides instructions for installing optional hardware devices in the blade server. Some option-removal instructions are provided in case you have to remove one option to install another. Installation guidelines Before you begin installing options in the blade server, read the following information: v Read the safety information that begins on page v and the guidelines in "Handling static-sensitive devices" on page 18. This information will help you work safely. v When you install your new blade server, take the opportunity to download and apply the most recent firmware updates. This step will help to make sure that any known issues are addressed and that your blade server is ready to function at maximum levels of performance. To download firmware updates for your blade server, go to http://www.ibm.com/bladecenter/, click Support, select BladeCenter LS21 or BladeCenter LS41 from the Hardware list, click Go, and then click the Download tab. v Observe good housekeeping in the area where you are working. Place removed covers and other parts in a safe place. v Back up all important data before you make changes to disk drives. v Before you remove a hot-swap blade server from the BladeCenter unit, you must shut down the operating system and turn off the blade server. You do not have to shut down the BladeCenter unit itself. v Blue on a component indicates touch points, where you can grip the component to remove it from or install it in the blade server, or open or close a latch. v Orange on a component or an orange label on or near a component indicates that the component can be hot-swapped, which means that you can remove or install the component while the BladeCenter unit is running. (Orange can also indicate touch points on hot-swap components.) See the instructions for removing or installing a specific hot-swap component for any additional procedures that you might have to perform before you remove or install the component. v When you are finished working on the blade server, reinstall all safety shields, guards, labels, and ground wires. v For a list of supported options for the blade server, go to http://www.ibm.com/ servers/eserver/serverproven/compat/us/. © Copyright IBM Corp. 2006 17