Insignia NS-BK2TBK8 User Guide - Page 11
Attaching the guard rail, Installing the draft arm assembly
View all Insignia NS-BK2TBK8 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Dual Beer Kegerator/Beverage Cooler Attaching the guard rail • Insert the guard rail into the holes on the top of the kegerator. Installing the draft arm assembly 1 Remove the cabinet plug from the top of the kegerator. 2 Align the beer gasket with the holes on the top of the cabinet. 3 Pass both the wing nut and the beer tube (both are attached to the draft arm assembly) through the hole on the worktop until the draft arm assembly is resting on the top of the cabinet. 4 Align the holes in the draft arm with the holes in the gasket, then attach the draft arm to the worktop with the four screws provided. 5 Attach the black plastic beer tap handles to the top of the faucets, tightening by hand. Hold the silver ring snug so it does not move. Beer tap handle Draft arm assembly Wing nut and beer tube Beer gasket screws Beer gasket Note If there is a small drip after you pour a beverage, you may have tightened the beer tap handle too much. If so, unscrew the silver snug ring one turn, then retighten the beer tap handle. www.insigniaproducts.com 11