LiftMaster SW420 SW420 GL BOARD Manual - Page 10
Pad Mounting, IMPORTANT NOTE
View all LiftMaster SW420 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
INSTALLATION PAD MOUNTING 1. Layout the concrete pad (Figure 1). IMPORTANT NOTE: The relative location of the operator to the fence and the gate is critical. Be sure that the measurements for operator mounting are taken from the centerline of the fence and of the gate hinge. 2. Locate electrical conduit, as required, prior to pouring concrete. 3. Pour concrete pad. 4. Bolt the (2) pad mount brackets to the bottom of the operator with the hardware provided. 5. Secure the operator to the concrete pad. It is very important that the operator be level and square to the gate. Figure 1 Pivot Gate Fence Line 6-1/2" 19" 18"x30" Pad Minimum 26-3/4" 6" 1/2" Concrete Anchor Bolts Pivot Gate Parallel Mount Fence Line 14-3/4" 6" 18-1/2" 19" Figure 2 Perpendicular Mount Using Suitable Hardware Secure Operator to L-bolts Concrete Pad 1/2" (12.7 mm) Concrete Anchors (4 Required) Power and Control Wiring Should Be Run In Separate Conduit 2" to 4" (5.1 to 10.2 cm) Above Grade Depth Required By Local Codes or Below Frost Line Hardware Type (6X) 10 Pad Mount Bracket