LiftMaster SW420 SW420 GL BOARD Manual - Page 11
Pedestal Mounting
View all LiftMaster SW420 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION PEDESTAL MOUNTING 1. Locate and anchor pedestal. Pedestal should be parallel and square to the gate. IMPORTANT NOTE: The distance between mounting pedestal and the relative location of the operator to the gate and fence is critical. 2. Locate electrical conduit, as required, prior to pouring concrete. 3. Bolt the mounting brackets to the pedestal. 4. Secure the operator to the pedestal by dropping it onto the pedestal and allowing the mounting studs to slip through the holes on the pedestal brackets. Secure with hex nuts provided. Figure 1 Pivot Gate Hinge Pin Fence Line 14" 26" Parallel Mount Pivot Gate Hinge Pin Fence Line 14" 26" Figure 2 Pedestal 24" Deep In-Ground Minimum Perpendicular Mount Pedestal Mount Kit 65RSWP Power and Control Wiring Should Be Run In Separate Conduit Concrete Pad 2" to 4" (5.1 to 10.2 cm) Above Grade Depth Required By Local Codes or Below Frost Line Nut (8x) Bolt (4x) From Bracket to Pedestal 11