LiftMaster SW420 SW420 S3 BOARD Manual - Page 2

Contents - swing gate

Page 2 highlights

2 Contents Contents General Information 4 Parts Supplied 4 Model Classifications 4 Specifications 5 Safety Information 6 Safety Instructions 6 Safety Precautions for Swing Gates and Ornamental "Grill Type" Gates 8 Preparing the Installation 9 Pre-Installation Check List 9 Wiring Specifications 9 Operator Preparation 10 Installation 11 Post Mount Installation 11 Pad Mount Installation 13 Pedestal Mount Installation 14 Control Arm Assembly 15 System Features 17 Visible/Audible Devices 17 Single/Three Button Controls and the Microprocessor 17 Obstruction Sensing 18 Circuitry 18 Programming 19 Switch #1: Operator Programming 19 Switch #2: Timer to Close 20 Limit Switch Adjustments 21 Controls and Accessory Installation 24 Manual Operation 25 Required Maintenance 26 Troubleshooting 27 Doc 01-G0610 Rev A

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

2
Contents
Doc 01-G0610
Rev A
Contents
General Information
______________________________________________________ 4
Parts Supplied _______________________________________________________________________
4
Model Classifications _________________________________________________________________
4
Specifications _______________________________________________________________________ 5
Safety Information ________________________________________________________
6
Safety Instructions____________________________________________________________________
6
Safety Precautions for Swing Gates and Ornamental “Grill Type” Gates
_________________________ 8
Preparing the Installation
__________________________________________________ 9
Pre-Installation Check List _____________________________________________________________
9
Wiring Specifications _________________________________________________________________
9
Operator Preparation _________________________________________________________________
10
Installation _____________________________________________________________ 11
Post Mount Installation _______________________________________________________________
11
Pad Mount Installation
_______________________________________________________________ 13
Pedestal Mount Installation____________________________________________________________
14
Control Arm Assembly _______________________________________________________________
15
System Features _________________________________________________________
17
Visible/Audible Devices ______________________________________________________________
17
Single/Three Button Controls and the Microprocessor_______________________________________
17
Obstruction Sensing
_________________________________________________________________ 18
Circuitry __________________________________________________________________________ 18
Programming ___________________________________________________________ 19
Switch #1: Operator Programming ______________________________________________________
19
Switch #2: Timer to Close_____________________________________________________________
20
Limit Switch Adjustments
_________________________________________________ 21
Controls and Accessory Installation
_________________________________________ 24
Manual Operation _______________________________________________________
25
Required Maintenance____________________________________________________
26
Troubleshooting _________________________________________________________ 27