Netgear XSM7224S XSM7224S Hardware Installation Guide - Page 9
Hardware Installation, Package Contents, Protecting Against Electrostatic Discharge - rack mount kit
UPC - 606449073706
View all Netgear XSM7224S manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
2. Hardware Installation 2 This chapter explains how to install the hardware for the Managed Stackable Layer 2+ 10G Switch XSM7224S. Package Contents Each switch is packed and shipped separately. The package contains the following items: • Managed Stackable Layer 2+ 10Gigabit Ethernet Switch with preinstalled software • Power cord • USB to serial converter • Rubber footpads for tabletop installation • Rubber caps for the SFP+ sockets • Rack-mounting kit • Null-modem serial cable (RS-232) with 9-pin connectors • Resource CD: The CD either includes these documents or links to access them: - ProSafe 7200 Managed Switch CLI Manual, Version 9.0 - NETGEAR 7000 Series Managed Switch Administration Guide - NETGEAR Installation Guide for the XSM7224S Stackable Managed Switch - This Hardware Installation Guide • ProSafe NMS100 Network Management System 30-day trial CD-ROM Protecting Against Electrostatic Discharge WARNING! Static electricity can harm delicate components inside your system. To prevent static damage, discharge static electricity from your body before you touch any of the electronic components, such as the microprocessor. You can do so by periodically touching an unpainted metal surface on the switch. Chapter 2. Hardware Installation | 9