TP-Link 10GE T1700G-28TQ V1 Installation Guide - Page 22

Power On, 5 Initialization

Page 22 highlights

JetStream Gigabit Stackable Smart Switch ■■ The voltage of the power supply meets the requirement of the input voltage of the device. ■■ The power socket, device and rack are well grounded. ■■ The device is correctly connected to other network devices. 4.4 Power On Plug in the negative connector of the provided power cord into the power socket of the device, and the positive connector into a power outlet as the following figure shows. 2 1 Figure 4-3 Connecting to Power Supply Note: The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4.5 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond in the following order: 1. The PWR LED lights on all the time. The SYS LED and the LED indicators of all the ports keep off. 2. After over one minute, the LED indicators of all the ports will flash momentarily and then turn off. 3. A few seconds later, the SYS LED indicator will flash, which represents a successful initialization. 17 Connection

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

JetStream Gigabit Stackable Smart Switch
Connection
17
The voltage of the power supply meets the requirement of the input voltage of the device.
The power socket, device and rack are well grounded.
The device is correctly connected to other network devices.
4.4 Power On
Plug in the negative connector of the provided power cord into the power socket of the
device, and the positive connector into a power outlet as the following figure shows.
1
2
Figure 4-3
Connecting to Power Supply
Note:
The figure is to illustrate the application and principle. The power plug you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
4.5 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions properly. During this time, its LED indica-
tors will respond in the following order:
1. The PWR LED lights on all the time. The SYS LED and the LED indicators of all the
ports keep off.
2. After over one minute, the LED indicators of all the ports will flash momentarily and
then turn off.
3. A few seconds later, the SYS LED indicator will flash, which represents a successful
initialization.