TP-Link 10GE T1700G-28TQ V1 Installation Guide - Page 22
Power On, 5 Initialization
View all TP-Link 10GE manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 22 highlights
JetStream Gigabit Stackable Smart Switch ■■ The voltage of the power supply meets the requirement of the input voltage of the device. ■■ The power socket, device and rack are well grounded. ■■ The device is correctly connected to other network devices. 4.4 Power On Plug in the negative connector of the provided power cord into the power socket of the device, and the positive connector into a power outlet as the following figure shows. 2 1 Figure 4-3 Connecting to Power Supply Note: The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4.5 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond in the following order: 1. The PWR LED lights on all the time. The SYS LED and the LED indicators of all the ports keep off. 2. After over one minute, the LED indicators of all the ports will flash momentarily and then turn off. 3. A few seconds later, the SYS LED indicator will flash, which represents a successful initialization. 17 Connection