TP-Link T2500-28TCTL-SL5428E T2500-28TCUN V1 Installation Guide - Page 19
Verify Installation, 5 Power
View all TP-Link T2500-28TCTL-SL5428E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
L2 Managed Switch Figure 4-3 Connecting the Console Port You can also manage the device through the console port, for details please refer to the CLI Reference Guide on the resource CD. Note: ■■ The console port is the first port on the left of the front panel. ■■ Please keep the device power off when plugging the console cable. ■■ Do not connect the console port with other ports by RJ45 cable. 4.4 Verify Installation After completing the installation, please verify the following items: ■■ There are 5-10cm of clearance around the sides of the device for ventilation and the air flow is adequate. ■■ The voltage of the power supply meets the requirement of the input voltage of the device. ■■ The power socket, device and rack are well grounded. ■■ The device is correctly connected to other network devices. 4.5 Power On Plug the female connector of the provided power cord into the power socket of the device, and the male connector into a power outlet as the following figure shows. Figure 4-4 Connecting to Power Supply Connection 14