TP-Link T2500-28TCTL-SL5428E T2500-28TCUN V1 Installation Guide - Page 20
Initialization
View all TP-Link T2500-28TCTL-SL5428E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
L2 Managed Switch Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4.6 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ The Power LED indicator will light on all the time. ■■ After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization. ■■ The System LED indicator will flash, which represents a successful initialization. 15 Connection