TP-Link T2500-28TCTL-SL5428E T2500-28TCUN V1 Installation Guide - Page 20

Initialization

Page 20 highlights

L2 Managed Switch Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4.6 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ The Power LED indicator will light on all the time. ■■ After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization. ■■ The System LED indicator will flash, which represents a successful initialization. 15 Connection

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

15
L2 Managed Switch
Note:
The figure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
4.6 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The Power LED indicator will light on all the time.
After keeping off for several seconds, the LED indicators of all the ports will flash
momentarily and then turn off again after the initialization.
The System LED indicator will flash, which represents a successful initialization.
Connection