Tripp Lite BP480V65 Owners Manual for Extended-Run Battery Cabinet English - Page 2

Table of Contents

Page 2 highlights

Table of Contents 1. Introduction 3 Features 3 2. Important Safety 4 Instructions Installation and 4 Location Warnings Connection Warnings 4 Battery Warnings 5 3. Battery Cabinet Installation 7 3.1 Preparation 7 3.2 Transportation 7 3.3 Mechanical Check 7 3.4 Internal Wiring (Typical) 8 3.5 Preliminary Electrical Check 8 (After Battery Installation) 3.6 Battery Cabinet Placement 8 3.7 Electrical Connection 9 3.8 Final Electrical Check 10 4. Operation and Charging 11 4.1 Determine Charging Voltages 11 4.2 Initial Charge 11 4.3 Operational Check 11 7. Installation 15 7.1 Battery Pre-Installation 15 7.2 Cable Jumpers and 16 Internal Wiring 7.2.1 Included Cable 16 Jumpers Specifications 7.2.2 Installing Cable Jumpers 17 to Battery Terminals 7.2.3 Battery Cabinet 18 Internal Wiring 7.3 Battery Installation 21 7.4 Installation Specifications 33 7.4.1 Installation and 33 Floor Loading Information 7.4.2 Recommended Torque 33 8. Storage and Service 34 9. Warranty 35 5. Maintenance 11 5.1 Maintenance Schedule 11 5.1.1 Quarterly Check 11 6. Mechanical Data 12 6.1 Physical Measurements 12 6.1.1 BP480V40/NIB 12 Measurements 6.1.2 BP480V65/NIB and 13 BP480V100/NIB Measurements 6.2 Battery Requirements 14 6.2.1 BP480V40/NIB Battery 14 6.2.2 BP480V65/NIB Battery 14 6.1.3 BP480V100/NIB Battery 14 2 18-09-176-933861.indb 2 9/26/2018 10:54:10 AM

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176

2
Table of Contents
1. Introduction
3
Features
3
2. Important Safety
4
Instructions
Installation and
4
Location Warnings
Connection Warnings
4
Battery Warnings
5
3. Battery Cabinet Installation
7
3.1 Preparation
7
3.2 Transportation
7
3.3 Mechanical Check
7
3.4 Internal Wiring (Typical)
8
3.5 Preliminary Electrical Check
8
(After Battery Installation)
3.6 Battery Cabinet Placement
8
3.7 Electrical Connection
9
3.8 Final Electrical Check
10
4. Operation and Charging
11
4.1 Determine Charging Voltages 11
4.2 Initial Charge
11
4.3 Operational Check
11
5. Maintenance
11
5.1 Maintenance Schedule
11
5.1.1 Quarterly Check
11
6. Mechanical Data
12
6.1 Physical Measurements
12
6.1.1 BP480V40/NIB
12
Measurements
6.1.2 BP480V65/NIB and
13
BP480V100/NIB
Measurements
6.2 Battery Requirements
14
6.2.1 BP480V40/NIB Battery
14
6.2.2 BP480V65/NIB Battery
14
6.1.3 BP480V100/NIB Battery 14
7. Installation
15
7.1 Battery Pre-Installation
15
7.2 Cable Jumpers and
16
Internal Wiring
7.2.1 Included Cable
16
Jumpers Speciļ¬cations
7.2.2 Installing Cable Jumpers 17
to Battery Terminals
7.2.3 Battery Cabinet
18
Internal Wiring
7.3 Battery Installation
21
7.4 Installation Speciļ¬cations
33
7.4.1 Installation and
33
Floor Loading Information
7.4.2 Recommended Torque
33
8. Storage and Service
34
9. Warranty
35
18-09-176-933861.indb
2
9/26/2018
10:54:10 AM