Weider Club 4870 English Manual - Page 15

Cable Assembly - cable diagram

Page 15 highlights

23. Apply grease to an M10 x 75mm Bolt (96). Attach 23 the Leg Press Plate (29) to the Leg Press (12) with the Bolt and an M10 Nylon Locknut (84). Do not overtighten the Nylon Locknut; the Leg Press Plate must be able to pivot easily. Cable Assembly 24 24. During steps 24-53, see the CABLE DIAGRAM on page 28 to identify the cables and ensure proper cable routing. Identify the Butterfly Cable (73). Attach the Cable to the Right Upright (7) with an M8 x 25mm Shoulder Bolt (92) and an M8 Nylon Locknut (101). Make sure that the Cable end can pivot easily around the shoulder of the Bolt. 25. During steps 25-52, see the PART IDENTIFI- 25 CATION CHART to identify the different types of pulleys. Wrap the Butterfly Cable (73) around a Pulley (43). Attach the Pulley, a Cable Trap (48), an M10 Washer (108), and two Guards (45) to the Left Butterfly Arm (22) with an M10 x 50mm Bolt (105) and an M10 Nylon Locknut (84). Make sure that the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 26. Wrap the Butterfly Cable (73) around a Pulley 26 (43). Attach the Pulley, a Cable Trap (48), an M10 Washer (108), and two Half Guards (46) to the Right Upright (7) with an M10 x 120mm Bolt (97), an M10 Washer, and an M10 Nylon Locknut (84). Make sure that the Cable Trap is oriented to hold the Cable in the groove of the Pulley. Make sure the Half Guards are oriented as shown. 15 Grease 96 84 29 12 92 73 7 101 84 45 43 105 48 73 108 45 22 84 46 43 48 73 108 46 7 108 97

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

15
23. Apply grease to an M10 x 75mm Bolt (96). Attach
the Leg Press Plate (29) to the Leg Press (12)
with the Bolt and an M10 Nylon Locknut (84).
Do
not overtighten the Nylon Locknut; the Leg
Press Plate must be able to pivot easily.
24.
During steps 24–53, see the CABLE DIAGRAM
on page 28 to identify the cables and ensure
proper cable routing.
Identify the Butterfly Cable (73).
Attach the
Cable to the Right Upright (7) with an M8 x 25mm
Shoulder Bolt (92) and an M8 Nylon Locknut
(101).
Make sure that the Cable end can pivot
easily around the shoulder of the Bolt.
96
29
12
23
24
92
73
7
101
Grease
84
Cable Assembly
25.
During steps 25–52, see the PART IDENTIFI-
CATION CHART to identify the different types
of pulleys.
Wrap the Butterfly Cable (73) around a Pulley
(43). Attach the Pulley, a Cable Trap (48), an M10
Washer (108), and two Guards (45) to the Left
Butterfly Arm (22) with an M10 x 50mm Bolt (105)
and an M10 Nylon Locknut (84).
Make sure that
the Cable Trap is oriented to hold the Cable in
the groove of the Pulley.
26. Wrap the Butterfly Cable (73) around a Pulley
(43). Attach the Pulley, a Cable Trap (48), an M10
Washer (108), and two Half Guards (46) to the
Right Upright (7) with an M10 x 120mm Bolt (97),
an M10 Washer, and an M10 Nylon Locknut (84).
Make sure that the Cable Trap is oriented to
hold the Cable in the groove of the Pulley.
Make sure the Half Guards are oriented as
shown.
84
45
45
22
73
43
105
48
108
25
26
46
73
46
48
43
7
108
108
97
84