Weider Pro 355 English Manual - Page 7
fac!tc
View all Weider Pro 355 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
2. Press a 2" Square Inner Cap (46) into the Left Upright (18). Press four 1" Round Inner Caps (39) into the Left Upright. Slide the Left Upright (18) onto the indicated M8 x 60mm Carriage Bolts (3). The adjustment brackets on the Left Upright must be on the side shown. Hand-tighten an M8 Nylon Locknut (13) onto each Carriage Bolt. Assemble the Right Upright (19) in the same manner. 2 46 18 39 46 'Q 0 19 0 39 Adjustment Brackets 4 4 3 3. Attach one side of the Crossbar (22) to the Left Upright (1A) ja,ith F.A. MA v eernrn fac!tc (8) •,.... me Washers (13), and one M8 Nylon Locknut (4). Note: The upper hole in the Crossbar is threaded. Do not tighten the Nylon Locknut or the Bolts yet. Attach the other side of the Crossbar (22) to the Right Upright (19) in the same manner. 4. Press two 2 1/2" Square Bushings (53) into the Weight Carriage (52). Press two 1" Round Inner Caps (39) into the Weight Carriage (52). 3 22 Threaded Hole 13 8 18 4 39 7 8 13 4 0 19 0 53 39 is) O O 52 53