Weider Pro 355 English Manual - Page 8
Weider Pro 355 Manual
View all Weider Pro 355 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
5. Slide the Weight Carriage (52) onto the Main Upright (42). The bracket must be on the side shown. Press a 2" Square Inner Cap (46) into each end of the Top Frame (21). Attach the. Top Frame to the Main Upright (42) with an M8 x 68mm Bolt (8), an M8 Washer (13), and an M8 Nylon Locknut (4). Attach the Top Frame (21) to the Crossbar (22) with two M8 x 68mm Bolts (8), two M8 Washers (13), and two M8 Nylon Locknuts (4). Tighten all Nylon Locknuts and Bolts used in steps 1-5 now. 6. Wrap the Cable (51) around a Pulley (24). Attach the Pulley to the Main Upright (42) with an M10 x 89mm Bolt (9), an M10 Washer (10), and an M10 Nylon Locknut (2). Be sure that the cable stop is on the indicated side of the Pulley and that the Cable is between the Pulley and the welded post. 7. Attach two Pulleys (24) and two Cable Traps (23) to the Top Fiairie (21) with ari MIG x 120(nryt Bolt (12) and an M10 Nylon Locknut (2). Do not tighten the Nylon Locknut yet. Route the Cable (51) around the indicated Pulley (24) from the direction shown. Be sure that the Cable is between the Pulley and the Cable Trap (23). 5 46-_6 8 Bracket 52 42 13 4 4 21 ' lf,----46 22 4:-..- -13 o 6 42 2- 51 . 10 2 Cable Stop Welded Post 7 51 24 23 12 .G° 2 - N.J O 24 23 21 s am • 8. Wrap the Cable (51) around a Pulley (24). Attach the Pulley to the Weight Carriage (52) with an M10 x 43mm Bolt (11) and an M10 Nylon Locknut (2). The Cable must be routed around the Pulley from the direction shown. 8 24 51 42 11 52 2