3Ware 9500S-4LP Installation Guide - Page 112
For the full-height board, the bracket sits on top of the board, removed in Step 2.
UPC - 693494950045
View all 3Ware 9500S-4LP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 112 highlights
Appendix A. Installing the Battery Backup Unit 6 Align the Battery Backup Unit to the controller with these connectors: Mate the connector on the BBU with the receptacle on the controller. Match the plastic post on the BBU with the hole on the controller. 7 Press down gently until the BBU is seated. Figure 8. BBU attached to controller 8 Reconnect the PCI bracket, using the phillips screws you removed in Step 2. For the full-height board, the bracket sits on top of the board, and screws are inserted from the bottom. For the half-height board, the bracket sits on the bottom of the board, with screws inserted from the top. 104 3ware 9000 Series Serial ATA RAID Controller Installation Guide
Appendix A. Installing the Battery Backup Unit
104
3ware 9000 Series Serial ATA RAID Controller Installation Guide
6
Align the Battery Backup Unit to the controller with these
connectors:
Mate the connector on the BBU with the receptacle on the
controller.
Match the plastic post on the BBU with the hole on the
controller.
7
Press down gently until the BBU is seated.
Figure 8.
BBU attached to controller
8
Reconnect the PCI bracket, using the phillips screws you
removed in Step 2.
For the full-height board, the bracket sits on top of the board,
and screws are inserted from the bottom.
For the half-height board, the bracket sits on the bottom of the
board, with screws inserted from the top.