3Ware 9650SE-2LPB-10 CLI Guide - Page 55

/cx show selftest, Memory Access and SMART Self Monitoring Analysis and Reporting. - 100

Page 55 highlights

Controller Object Commands //localhost> /c1 show verify Verify Schedule for Controller /c1 Slot Day Hour Duration Status 1 Mon 2:00am 4 hr(s) disabled 2 - - - disabled 3 Tue 12:00am 24 hr(s) disabled 4 Wed 12:00am 24 hr(s) disabled 5 Thu 12:00am 24 hr(s) disabled 6 Fri 12:00am 24 hr(s) disabled 7 Sat 12:00am 24 hr(s) disabled A status of "disabled" indicates that the controller will not use the defined schedule timeslots and will start verifying immediately (within 10 to 15 minutes), if the verify command is entered manually, or it will begin automatically if the autoverify option is set. Rebuilds, migrations, and initializations will take priority over verifies. /cx show selftest 9000 series controllers support background tasks and allow you to schedule a regular time when they occur. Selftest is one of the supported background tasks. Rebuild and verify are other background tasks for which there are separate schedules. Migrate and initialize are additional background tasks that follow the same schedule as rebuild. For each background task, up to 7 time periods can be registered, known as slots 1 through 7. Each task schedule can be managed by a set of commands including add, del, show and set a task. Background task schedules have a slot id, start-day-time, duration, and status attributes. For details about setting up a schedule for background selftest tasks, see "Setting Up a Selftest Schedule" on page 52. Selftest activity provides two types of selftests; UDMA (Ultra Direct Memory Access) and SMART (Self Monitoring Analysis and Reporting). Both self tests are checked once each day by default. UDMA self test entails checking the current ATA bus speed (between controller and attached disk), which could have been throttled down during previous operations and increase the speed for best performance (usually one level higher). Possible speeds include 33, 66, 100 and 133 Mhz (at this writing). Note that UDMA selftest is not applicable (or required) with SATA drives, but is left enabled by default. SMART activity instructs the controller to check certain SMART supported thresholds by the disk vendor. An AEN is logged to the alarms page if a drive reports a SMART failure. www.3ware.com 49

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103

Controller Object Commands
www.3ware.com
49
//localhost> /c1 show verify
Verify Schedule for Controller /c1
========================================================
Slot
Day
Hour
Duration
Status
--------------------------------------------------------
1
Mon
2:00am
4 hr(s)
disabled
2
-
-
-
disabled
3
Tue
12:00am
24 hr(s)
disabled
4
Wed
12:00am
24 hr(s)
disabled
5
Thu
12:00am
24 hr(s)
disabled
6
Fri
12:00am
24 hr(s)
disabled
7
Sat
12:00am
24 hr(s)
disabled
A status of “disabled” indicates that the controller will not use the defined
schedule timeslots and will start verifying immediately (within 10 to 15
minutes), if the verify command is entered manually, or it will begin
automatically if the autoverify option is set. Rebuilds, migrations, and
initializations will take priority over verifies.
/c
x
show selftest
9000 series controllers support background tasks and allow you to schedule a
regular time when they occur.
Selftest is one of the supported background tasks. Rebuild and verify are other
background tasks for which there are separate schedules. Migrate and
initialize are additional background tasks that follow the same schedule as
rebuild. For each background task, up to 7 time periods can be registered,
known as slots 1 through 7. Each task schedule can be managed by a set of
commands including
add
,
del
, show and
set
a task. Background task
schedules have a slot id, start-day-time, duration, and status attributes.
For details about setting up a schedule for background selftest tasks, see
“Setting Up a Selftest Schedule” on page 52.
Selftest
activity provides two types of selftests; UDMA (Ultra Direct
Memory Access) and SMART (Self Monitoring Analysis and Reporting).
Both self tests are checked once each day by default.
UDMA self test entails checking the current ATA bus speed (between
controller and attached disk), which could have been throttled down during
previous operations and increase the speed for best performance (usually one
level higher). Possible speeds include 33, 66, 100 and 133 Mhz (at this
writing). Note that UDMA selftest is not applicable (or required) with SATA
drives, but is left enabled by default.
SMART activity instructs the controller to check certain SMART supported
thresholds by the disk vendor.
An AEN is logged to the alarms page if a drive
reports a SMART failure.