EMC DS-16B Installation Guide - Page 13

below for an illustration of the complete assembly.

Page 13 highlights

Installing the DS-16B2 Rails Select the appropriate length rails, and follow the steps below to install them. The rails assembly consists of a front rail, an adjustable rear rail, ac power cord, and two washers and keps nuts. See the figure below for an illustration of the complete assembly. Keps Nut (2) #10 Flat Washer (2) Short Rear Rail Front Rail Ac Power Cord Figure 9 Ac Power Cord Front Rail DS-16B2 Rails Assembly Short Rear Rail #10 Flat Washer (2) Keps Nut (2) EMC2044 EMC Departmental Switch DS-16B2 Installation Guide 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

EMC Departmental Switch DS-16B2
Installation Guide
13
Installing the DS-16B2 Rails
Select the appropriate length rails, and follow the steps below to
install them. The rails assembly consists of a front rail, an adjustable
rear rail, ac power cord, and two washers and keps nuts. See the
figure below for an illustration of the complete assembly.
Figure 9
DS-16B2 Rails Assembly
EMC2044
Short
Rear
Rail
Short
Rear
Rail
Front
Rail
Front
Rail
Ac Power
Cord
Ac Power
Cord
Keps Nut
(2)
Keps Nut
(2)
#10 Flat
Washer
(2)
#10 Flat
Washer
(2)