EMC DS-16B Installation Guide - Page 15

adjustable rail slides over the top of the slot on the front rail

Page 15 highlights

Installing the DS-16B2 Rails 3. Insert the slots of the rear adjustable rail onto the threaded posts on the front rail. Be sure that the lip on the top of the rear adjustable rail slides over the top of the slot on the front rail, thereby capturing the ac power cord. 4. Secure the adjustable rail to the front rail with two #10 flat washers and M5 keps nuts. Leave the keps nuts finger tight. See Figure 11. Keps Nut Figure 11 Location of Keps Nuts EMC2066 EMC Departmental Switch DS-16B2 Installation Guide 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

EMC Departmental Switch DS-16B2
Installation Guide
15
Installing the DS-16B2 Rails
3.
Insert the slots of the rear adjustable rail onto the threaded posts
on the front rail. Be sure that the lip on the top of the rear
adjustable rail slides over the top of the slot on the front rail,
thereby capturing the ac power cord.
4.
Secure the adjustable rail to the front rail with two #10 flat
washers and M5 keps nuts. Leave the keps nuts finger tight. See
Figure 11.
Figure 11
Location of Keps Nuts
EMC2066
Keps
Nut