EMC DS-16B Installation Guide - Page 4

Device Placement Requirements, Power distribution must support the number of outlets required - ds 16b2 switches

Page 4 highlights

Device Placement Requirements Device Placement Requirements There are no restrictions on the location of the DS-16B2 switch in the rack/cabinet. Switches are typically located at the top of the rack/cabinet in pairs. Power distribution must support the number of outlets required for the switch and the switch power rating listed in the table on page 3. Note: Switch bezels are removed for clarity. Switch (1 U) Switch (1 U) Filler Panel (2 U) DAE (3.5 U) DAE (3.5 U) DAE (3.5 U) DAE (3.5 U) 39 U DAE (3.5 U) DAE (3.5 U) DAE (3.5 U) DAE (3.5 U) DPE (6.5 U) Figure 2 SPS (1 U) Front Sample Cabinet Installation 4 EMC Departmental Switch DS-16B2 Installation Guide Rear EMC2056

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

4
EMC Departmental Switch DS-16B2
Installation Guide
Device Placement Requirements
Device Placement Requirements
There are no restrictions on the location of the DS-16B2 switch in the
rack/cabinet.
Switches are typically located at the top of the rack/cabinet in pairs.
Power distribution must support the number of outlets required for
the switch and the switch power rating listed in the table on page 3.
Figure 2
Sample Cabinet Installation
EMC2056
Front
Rear
Switch (1 U)
Switch (1 U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DAE (3.5
U)
DPE (6.5
U)
Filler Panel (2 U)
SPS (1 U)
39 U
Note: Switch bezels are
removed for clarity.