EMC DS-16B Installation Guide - Page 26
stud. Repeat for the other ball stud. See
View all EMC DS-16B manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installing the DS-16B2 Switch 11. Position the #10 washer and ball stud in the center hole between the two screws securing the rail to the channel. Tighten the ball stud. Repeat for the other ball stud. See Figure 21. #10 Flat Ball Washer Stud Figure 21 Installing the Ball Studs EMC2054 26 EMC Departmental Switch DS-16B2 Installation Guide
26
EMC Departmental Switch DS-16B2
Installation Guide
Installing the DS-16B2 Switch
11.
Position the #10 washer and ball stud in the center hole between
the two screws securing the rail to the channel. Tighten the ball
stud. Repeat for the other ball stud. See Figure 21.
Figure 21
Installing the Ball Studs
EMC2054
Ball
Stud
#10 Flat
Washer