HP AE326A HP StorageWorks 1500 Modular Smart Array maintenance and service gui - Page 87
Verifying proper operation, Replacing a 2-Gb small form factor pluggable (SFP) transceiver
UPC - 882780184954
View all HP AE326A manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 87 highlights
Verifying proper operation After replacing the failed Fibre Channel I/O module verify that: • The Fibre Channel I/O module status LED is solid green. • Verify that the 1-Gb link status is solid green. • Verify that the 2-Gb link status is solid green. • No new error messages are displayed on the array controller LCD panel. Replacing a 2-Gb small form factor pluggable (SFP) transceiver The transceiver is hot-pluggable, so it is not necessary to power down the system to replace it. Before you begin WARNING! To reduce the risk of injury from laser radiation or damage to the equipment, observe the following precautions: • Do not open any panels, operate controls, make adjustments, or perform procedures to a laser device other than those specified herein. • Do not stare into laser beam when panels are open. CAUTION: • Before removing a component or blanking panel from an operational device, make sure that you have the replacement part available. Removing a component or blank impacts the airflow and cooling ability of the device. To avoid possible overheating, insert the new or replacement component within one or two minutes. If the internal temperature exceeds acceptable limits, the device may overheat and automatically shut down or restart. • Parts can be damaged by electrostatic discharge. Use proper anti-static protection. Verifying component failure Before replacing the SFP: • Verify that the Fibre Channel I/O module status LED is not illuminated or is blinking amber. • Check the array controller LCD display panel for error messages. Removing the component 1. Review all warnings, cautions, and preparation procedures as detailed in Warnings and precautions. 2. Press the release clip on the bottom of the cable connector to remove the Fibre Channel I/O cable from the back of the failed transceiver. 3. Remove the transceiver, either by pulling on the plastic tab or by swiveling the small wire handle on the SFP, depending on the SFP model. 4. Attach the protective cover on the cable and insert the dust plug cover in the failed SFP. Installing the component 1. Slide the replacement SFP into the port. maintenance and service guide 87