Task 14: Plan AC Power, Use the supplied power cords. Ensure the facility power receptacle
View all HP StorageWorks 2/24 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 276 highlights
Configuration Planning Tasks 6 Task 14: Plan AC Power Plan for facility power sources for each Fabricenter equipment cabinet, director, fabric switch, or SAN router as follows: • The Fabricenter equipment cabinet operates at 47 to 63 Hertz (Hz), 200 to 240 volts alternating current (VAC), and requires a minimum dedicated 30-ampere service. • The Intrepid 6140 Director operates at 47 to 63 Hz, 200 to 240 VAC, and requires a minimum dedicated 15-ampere service. • The Intrepid 10000 Director operates at 47 to 63 Hz, 200 to 240 VAC, and requires a minimum dedicated 20-ampere service. • Other directors, fabric switches, and SAN routers in the cabinet operate at 47 to 63 Hz, 100 to 240 VAC, and require a minimum dedicated 5-ampere service. If two power sources are supplied (optional but recommended for high availability), the equipment cabinet contains two customerspecified external power cords. Each cord should be connected to a separate power circuit, or both should be connected to a UPS. Several types of power cables and plugs are available to meet local electrical requirements. DANGER Use the supplied power cords. Ensure the facility power receptacle is the correct type, supplies the required voltage, and is properly grounded. Keep all power cables out of high-traffic areas for safety and to avoid power interruption caused by accidentally unplugging the product or Fabricenter equipment cabinet. 6-28 McDATA Products in a SAN Environment - Planning Manual