HP Superdome SX2000 Generic Site Preparation Guide, Fourth Edition - Page 30

Example of an Installation Schedule, Sample Site Inspection Checklist, Formulas

Page 30 highlights

- 1 ft. = 0.305 meters - 1 CFM = 1.7m3/hour • kVA conversions Three phase kVA = V × A × √3 / 1000 • Single phase kVA = V × A / 1000 Formulas • kVA = voltage × current (amps) • Watts = VA × PF • Btu = Watts × 3.41 • ºC = (32 + 1.8a) ºF Example of an Installation Schedule The following schedule lists the sequence of events for a typical system installation: • Sixty days before installation - Floor plan design is completed and mailed to HP (if required to be an HP task). • Thirty days before installation - Primary power and air-conditioning installation are completed. - Telephone and data cables are installed. - Fire protection equipment is installed. - Major facility changes are completed. - Special delivery requirements are defined. - Site inspection checklist is completed. See Table 1-6 and Table 1-7 (page 31) for sample customer information forms and site inspection checklists. - Delivery survey is completed. See Figure 1-13 (page 33) and Figure 1-14 (page 34) for a sample delivery survey. - A signed copy of the site inspection and delivery survey is mailed to HP. - Site inspection and predelivery coordination meeting is arranged with an HP representative to review the inspection checklist and to arrange an installation schedule. • Seven days before installation - Final check is made with an HP site preparation specialist to resolve any last-minute problems. NOTE: Not all installations follow a schedule like the one previously noted. Sometimes a server is purchased through another vendor, which can preclude a rigid schedule. Other conditions could also prevent following this schedule. For those situations, consider a milestone schedule. • Site Preparation-Schedule with the customer as soon as possible after the order is placed. • Site Verification-Schedule with the customer a minimum of one to two days before the product is scheduled to be installed. Sample Site Inspection Checklist See Table 1-6 and Table 1-7 (page 31). They may be used to measure your progress. 30 General Site Preparation Guidelines

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

1 ft. = 0.305 meters
1 CFM = 1.7m
3
/hour
kVA conversions
Three phase
kVA = V × A × √3 / 1000
Single phase
kVA = V × A / 1000
Formulas
kVA = voltage × current (amps)
Watts = VA × PF
Btu = Watts × 3.41
ºC = (32 + 1.8a) ºF
Example of an Installation Schedule
The following schedule lists the sequence of events for a typical system installation:
Sixty days before installation
Floor plan design is completed and mailed to HP (if required to be an HP task).
Thirty days before installation
Primary power and air-conditioning installation are completed.
Telephone and data cables are installed.
Fire protection equipment is installed.
Major facility changes are completed.
Special delivery requirements are defined.
Site inspection checklist is completed. See
Table 1-6
and
Table 1-7 (page 31)
for sample
customer information forms and site inspection checklists.
Delivery survey is completed. See
Figure 1-13 (page 33)
and
Figure 1-14 (page 34)
for
a sample delivery survey.
A signed copy of the site inspection and delivery survey is mailed to HP.
Site inspection and predelivery coordination meeting is arranged with an HP
representative to review the inspection checklist and to arrange an installation schedule.
Seven days before installation
Final check is made with an HP site preparation specialist to resolve any last-minute
problems.
NOTE:
Not all installations follow a schedule like the one previously noted. Sometimes a server
is purchased through another vendor, which can preclude a rigid schedule. Other conditions
could also prevent following this schedule. For those situations, consider a milestone schedule.
Site Preparation—Schedule with the customer as soon as possible after the order is placed.
Site Verification—Schedule with the customer a minimum of one to two days before the
product is scheduled to be installed.
Sample Site Inspection Checklist
See
Table 1-6
and
Table 1-7 (page 31)
. They may be used to measure your progress.
30
General Site Preparation Guidelines