HP Superdome SX2000 Generic Site Preparation Guide, Fourth Edition - Page 32

Delivery Survey, Table 1-7 Site Inspection Checklist

Page 32 highlights

Table 1-7 Site Inspection Checklist (continued) Check either Yes or No. If No, include comment number or date. 15a. Is dual source power used? If so, identify types and evaluate grounding. 16. Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is a dedicated branch circuit available for equipment? 20. Is the dedicated branch circuit less than 75 feet (22.86 m)? 21. Are the input circuit breakers adequate for equipment loads? Safety Number Area or Condition Yes No 22. Is an emergency power shutoff switch available? 23. Is a telephone available for emergency purposes? 24. Does the computer room have a fire protection system? 25. Does the computer room have antistatic flooring installed? 26. Do any equipment servicing hazards exist (loose ground wires, poor lighting, and so on)? Cooling Number Area or Condition Yes No 27. Can cooling be maintained between 5°C (41 °F) and 35°C (95 °F) (up to 1,525 m/5,000 ft)? Derate 1°C/305 m (34 °F/1,000 ft) above 1,525 m/5,000 ft and up to 3,048 m/10,000 ft. 28. Can temperature changes be held to 5°C (41 °F) per hour with tape media? Can temperature changes be held to 20°C (68 °F) per hour without tape media? 29. Can humidity level be maintained at 40% to 55% at 35°C (95 °F) noncondensing? 30. Are air-conditioning filters installed and clean? Storage Number Area or Condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training Number Area or Condition 33. Are personnel enrolled in the System Administrator's Course? 34. Is on-site training required? Comment or Date Delivery Survey The delivery survey forms list delivery or installation requirements. If any of the items on the list apply, enter the appropriate information (Figure 1-13 (page 33) and Figure 1-14 (page 34)) in the areas provided on the form. 32 General Site Preparation Guidelines

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Table 1-7 Site Inspection Checklist
(continued)
Comment or Date
Check either Yes or No. If No, include comment number or date.
Is dual source power used? If so, identify types and evaluate
grounding.
15a.
Does the input frequency correspond to equipment specifications?
16.
Are lightning arrestors installed inside the building?
17.
Is power conditioning equipment installed?
18.
Is a dedicated branch circuit available for equipment?
19.
Is the dedicated branch circuit less than 75 feet (22.86 m)?
20.
Are the input circuit breakers adequate for equipment loads?
21.
Safety
No
Yes
Area or Condition
Number
Is an emergency power shutoff switch available?
22.
Is a telephone available for emergency purposes?
23.
Does the computer room have a fire protection system?
24.
Does the computer room have antistatic flooring installed?
25.
Do any equipment servicing hazards exist (loose ground wires,
poor lighting, and so on)?
26.
Cooling
No
Yes
Area or Condition
Number
Can cooling be maintained between 5°C (41 °F) and 35°C (95 °F)
(up to 1,525 m/5,000 ft)? Derate 1°C/305 m (34 °F/1,000 ft) above
1,525 m/5,000 ft and up to 3,048 m/10,000 ft.
27.
Can temperature changes be held to 5°C (41 °F) per hour with
tape media? Can temperature changes be held to 20°C (68 °F) per
hour without tape media?
28.
Can humidity level be maintained at 40% to 55% at 35°C (95 °F)
noncondensing?
29.
Are air-conditioning filters installed and clean?
30.
Storage
No
Yes
Area or Condition
Number
Are cabinets available for tape and disc media?
31.
Is shelving available for documentation?
32.
Training
Area or Condition
Number
Are personnel enrolled in the System Administrator’s Course?
33.
Is on-site training required?
34.
Delivery Survey
The delivery survey forms list delivery or installation requirements. If any of the items on the
list apply, enter the appropriate information (
Figure 1-13 (page 33)
and
Figure 1-14 (page 34)
)
in the areas provided on the form.
32
General Site Preparation Guidelines