HP Superdome SX2000 Generic Site Preparation Guide, Fourth Edition - Page 31

Table 1-6 Customer and HP Information, Table 1-7 Site Inspection Checklist, Customer Information

Page 31 highlights

Table 1-6 Customer and HP Information Customer Information Name: Street address: State or province: Zip or postal code: Primary customer contact: Secondary customer contact: Traffic coordinator: Sales representative Representative making survey Scheduled delivery date Phone number: City or Town: Country Phone number: Phone number: Phone number: HP information Order number: Date: Table 1-7 Site Inspection Checklist Check either Yes or No. If No, include comment number or date. Computer Room Number Area or condition Yes No 1. Is there a completed floor plan? 2. Is adequate space available for maintenance needs? Front 36 inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? 6. Is the raised floor adequate for equipment loading? 7. Are channels or cutouts available for cable routing? 8. Is a network line available? 9. Is a telephone line available? 10. Are customer-supplied peripheral cables and LAN cables available and of the proper type? 11. Are floor tiles in good condition and properly braced? 12. Is floor tile underside shiny or painted? If painted, judge the need for particulate test. Power and Lighting Number Area or Condition Yes No 13. Are lighting levels adequate for maintenance? 14. Are AC outlets available for servicing needs (for example, laptop)? 15. Does the input voltage correspond to equipment specifications? Comment or Date Sample Site Inspection Checklist 31

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42

Table 1-6 Customer and HP Information
Customer Information
Phone number:
Name:
City or Town:
Street address:
Country
State or province:
Zip or postal code:
Phone number:
Primary customer contact:
Phone number:
Secondary customer contact:
Phone number:
Traffic coordinator:
HP information
Order number:
Sales representative
Date:
Representative making survey
Scheduled delivery date
Table 1-7 Site Inspection Checklist
Comment or Date
Check either Yes or No. If No, include comment number or date.
Computer Room
No
Yes
Area or condition
Number
Is there a completed floor plan?
1.
Is adequate space available for maintenance needs? Front 36 inches
(91.4 cm) minimum and rear 36 inches (91.4 cm) minimum are
recommended clearances.
2.
Is access to the site or computer room restricted?
3.
Is the computer room structurally complete? Expected date of
completion?
4.
Is a raised floor installed and in good condition?
5.
Is the raised floor adequate for equipment loading?
6.
Are channels or cutouts available for cable routing?
7.
Is a network line available?
8.
Is a telephone line available?
9.
Are customer-supplied peripheral cables and LAN cables available
and of the proper type?
10.
Are floor tiles in good condition and properly braced?
11.
Is floor tile underside shiny or painted? If painted, judge the need
for particulate test.
12.
Power and Lighting
No
Yes
Area or Condition
Number
Are lighting levels adequate for maintenance?
13.
Are AC outlets available for servicing needs (for example, laptop)?
14.
Does the input voltage correspond to equipment specifications?
15.
Sample Site Inspection Checklist
31