IBM 4800-741 Operation Guide - Page 50

connected.

Page 50 highlights

Updated October 31, 2007 Figure 18. Removing the sheet metal panel 5. See Figure 18 and place the unit in the operating position. Note: If you are installing a UPS, follow the remainder of these steps. If you are not inserting a UPS, go to Step 7 on page 32 to secure the expansion housing to the system unit. a. To install the UPS, remove the sheet metal panel (see Figure 18.) b. The unit as shipped from the factory does not have the battery connected. Connect the battery to the UPS as follows: Figure 19. Connecting the battery to the UPS c. See Figure 19, Picture 1. With the UPS on its side, remove the battery door. d. See Picture 2. Pull the battery out of the UPS such that you can view the wiring and plug. e. Connect the plug with the red wire (Picture 3). 30 SurePOS 700 Series: SurePOS 700-721/741/781, 722/742/782 Planning, Installation, and Operation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164

5.
See
Figure
18
and
place
the
unit
in
the
operating
position.
Note:
If
you
are
installing
a
UPS,
follow
the
remainder
of
these
steps.
If
you
are
not
inserting
a
UPS,
go
to
Step
7
on
page
32
to
secure
the
expansion
housing
to
the
system
unit.
a.
To
install
the
UPS,
remove
the
sheet
metal
panel
(see
Figure
18.)
b.
The
unit
as
shipped
from
the
factory
does
not
have
the
battery
connected.
Connect
the
battery
to
the
UPS
as
follows:
c.
See
Figure
19,
Picture
1.
With
the
UPS
on
its
side,
remove
the
battery
door.
d.
See
Picture
2.
Pull
the
battery
out
of
the
UPS
such
that
you
can
view
the
wiring
and
plug.
e.
Connect
the
plug
with
the
red
wire
(Picture
3).
Figure
18.
Removing
the
sheet
metal
panel
Figure
19.
Connecting
the
battery
to
the
UPS
Updated
October
31,
2007
30
SurePOS
700
Series:
SurePOS
700-721/741/781,
722/742/782
Planning,
Installation,
and
Operation
Guide