Intel S845WD1-E Product Guide - Page 37

Video Memory XE \, Network Interface Controller XE \, NIC Connector and Status LEDs

Page 37 highlights

2 Server Board Installation and Upgrading Tools and Supplies Needed • Phillips† (cross head) screwdriver (#1 bit and #2 bit) • Jumper removal tool or needle nosed pliers • Pen or pencil • Antistatic wrist strap and conductive foam pad (recommended) Before You Begin Emissions Disclaimer To ensure EMC compliance with your local regional rules and regulations, the final configuration of your end system product may require additional EMC compliance testing. For more information please contact your local Intel Representative. See "Regulatory and Integration Information" on page 91 for product Safety and EMC regulatory compliance information. This is an FCC Class A device. Integration of it into a Class B chassis does not result in a Class B device. Warnings and Cautions These warnings and cautions apply throughout this chapter. Only a technically qualified person should configure the server board. WARNING Hazardous conditions, devices & cables: Hazardous electrical conditions may be present on power, telephone, and communication cables. Turn off the server and disconnect the power cord, telecommunications systems, networks, and modems attached to the server before opening it. Otherwise, personal injury or equipment damage can result. CAUTIONS System power on/off: The power button DOES NOT turn off the system AC power. To remove power from system, you must unplug the AC power cord from the wall outlet. Make sure the AC power cord is unplugged before you open the chassis, add, or remove any components. 37

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

37
2 Server Board Installation and Upgrading
Tools and Supplies Needed
Phillips
(cross head) screwdriver (#1 bit and #2 bit)
Jumper removal tool or needle nosed pliers
Pen or pencil
Antistatic wrist strap and conductive foam pad (recommended)
Before You Begin
Emissions Disclaimer
To ensure EMC compliance with your local regional rules and regulations, the final configuration
of your end system product may require additional EMC compliance testing.
For more
information please contact your local Intel Representative.
See “Regulatory and Integration Information”
on page 91 for product Safety and EMC regulatory
compliance information.
This is an FCC Class A device.
Integration of it into a Class B chassis
does not result in a Class B device.
Warnings and Cautions
These warnings and cautions apply throughout this chapter.
Only a technically qualified person
should configure the server board.
WARNING
Hazardous conditions, devices & cables
:
Hazardous electrical
conditions may be present on power, telephone, and communication cables.
Turn off the server and disconnect the power cord, telecommunications
systems, networks, and modems attached to the server before opening it.
Otherwise, personal injury or equipment damage can result.
CAUTIONS
System power on/off:
The power button DOES NOT turn off the system
AC power.
To remove power from system, you must unplug the AC power
cord from the wall outlet.
Make sure the AC power cord is unplugged
before you open the chassis, add, or remove any components.