LG LMU240HE Service Manual - Page 23

Service Manual, Flaring Work and Connection of Piping

Page 23 highlights

4. Indoor unit installation Hook the indoor unit onto the upper portion of the installation plate.(Engage the two hooks of the rear top of the indoor unit with the upper edge of the installation plate.) Ensure that the hooks are properly seated on the installation plate by moving it left and right. Press the lower left and right sides of the unit against the installation plate until the hooks engage into their slots(clicking sound). Connecting the piping to the indoor unit and drain hose to drain pipe. 1. Align the center of the pipes and sufficiently tighten the flare nut by hand. 2. Tighten the flare nut with a wrench. Outside diameter mm inch Ø6.35 1/4 Ø9.52 3/8 Torque kg.m 1.8 4.2 3. When extending the drain hose at the indoor unit, install the drain pipe. Wrap the insulation material around the connecting portion. 1. Overlap the connection pipe insulation material and the indoor unit pipe insulation material. Bind them together with vinyl tape so that there may be no gap. 2. Wrap the area which accommodates the rear piping housing section with vinyl tape. 3. Bundle the piping and drain hose together by wrapping them with vinyl tape for enough to cover where they fit into the rear piping housing section. Flaring Work and Connection of Piping Connecting cable Drain hose Indoor unit tubing Flare nut Pipes Wrench Indoor unit tubing Open-end wrench (fixed) Flare nut Connection pipe Drain pipe Indoor unit drain hose Adhesive Vinyl tape(narrow) Plastic bands Insulation material Connection pipe Indoor unit pipe Vinyl tape (wide) Wrap with vinyl tape Connecting cable Pipe Vinyl tape(narrow) Pipe Wrap with vinyl tape Drain hose Vinyl tape(wide) Service Manual 23

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86

Service Manual
23
Flaring Work and Connection of Piping
4. Indoor unit installation
Hook the indoor unit onto the upper portion of the installa-
tion plate.(Engage the two hooks of the rear top of the
indoor unit with the upper edge of the installation plate.)
Ensure that the hooks are properly seated on the installa-
tion plate by moving it left and right.
Press the lower left and right sides of the unit against the
installation plate until the hooks engage into their
slots(clicking sound).
Connecting the piping to the indoor unit and drain hose
to drain pipe.
1. Align the center of the pipes and sufficiently tighten the
flare nut by hand.
2. Tighten the flare nut with a wrench.
3. When extending the drain hose at the indoor unit, install
the drain pipe.
Wrap the insulation material around the connecting por-
tion.
1. Overlap the connection pipe insulation material and the
indoor unit pipe insulation material. Bind them together
with vinyl tape so that there may be no gap.
2. Wrap the area which accommodates the rear piping hous-
ing section with vinyl tape.
3. Bundle the piping and drain hose together by wrapping
them with vinyl tape for enough to cover where they fit into
the rear piping housing section.
Drain hose
Connecting
cable
Indoor unit tubing
Flare nut
Pipes
Wrench
Indoor unit tubing
Open-end wrench (fixed)
Connection pipe
Flare nut
Vinyl tape(narrow)
Adhesive
Drain pipe
Indoor unit drain hose
Plastic bands
Insulation material
Vinyl tape(narrow)
Connection pipe
Connecting cable
Vinyl tape (wide)
Wrap with vinyl tape
Indoor unit pipe
Pipe
Wrap with vinyl tape
Drain hose
Pipe
Vinyl tape(wide)
mm
inch
kg
.
m
Ø
6.35
1/4
1.8
Ø
9.52
3/8
4.2
Outside diameter
Torque