LG LMU240HE Service Manual - Page 39

Test Running - compressor

Page 39 highlights

Test Running Test Running Split, Art Cool Type 1. Check that all tubing and wiring have been properly connected. 2. Check that the gas and liquid side service valves are fully open. 1) Prepare remote controller Remove the battery cover by pulling it according to the arrow direction. Insert new batteries making sure that the (+) and (-) of battery are installed correctly. Reattach the cover by pushing it back into position. Bolt Tubing connection 4) Evaluation of the performance Operate unit for 15~20 minutes, then check the system refrigerant charge: 1. Measure the pressure of the gas side service valve. 2. Measure the temperature of the intake and discharge of air. 3. Ensure the difference between the intake temperature and the discharge is more than 8°C(46°F) (Cooling) or reversely (Heating). NOTE: • Use 2 AAA(1.5volt) batteries. Do not use rechargeable batteries. • Remove the batteries from the remote controller if the sys- tem is not going to be used for a long time. 2) Precautions in test run I The initial power supply must provide at least 90% of the rated voltage. Otherwise, the air conditioner should not be operated. I For test run, carry out the cooling operation firstly even during heating season. If heating operation is carried out firstly, it leads to the trouble of compressor. Then attention must be paid. I Carry out the test run more than 5 minutes without fail. (Test run will be cancelled 18 minutes later automatically) I The test run is started by pressing timer cancel button five times continuously. (Room type) I To cancel the test run, press any button. 3) Settlement of outdoor unit I Anchor the outdoor unit with a bolt and nut(ø10mm) tightly and horizontally on a concrete or rigid mount. I When installing on the wall, roof or rooftop, anchor the mounting base securely with a nail or wire assuming the influence of wind and earthquake. I In the case when the vibration of the unit is conveyed to the hose, secure the unit with an anti-vibration rubber. Refrigerant Outside ambient TEMP. The pressure of the gas side service valve. R-410A 35°C (95°F) 8.5~9.5kg/cm2G(120~135 P.S.I.G.) Intake temperature Discharge air Discharge air Discharge temperature Intake temperature Discharge temperature Service Manual 39

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86

Service Manual
39
1. Check that all tubing and wiring have been properly con-
nected.
2. Check that the gas and liquid side service valves are
fully open.
1) Prepare remote controller
Remove the battery cover by pulling it according to
the arrow direction.
Insert new batteries making sure that the (+) and (
)
of battery are installed correctly.
Reattach the cover by pushing it back into position.
NOTE:
Use 2 AAA(1.5volt) batteries. Do not use rechargeable
batteries.
Remove the batteries from the remote controller if the sys-
tem is not going to be used for a long time.
2) Precautions in test run
The initial power supply must provide at least 90% of
the rated voltage.
Otherwise, the air conditioner should not be operated.
For test run, carry out the cooling operation firstly
even during heating season. If heating operation is
carried out firstly, it leads to the trouble of compres-
sor. Then attention must be paid.
Carry out the test run more than 5 minutes without
fail. (Test run will be cancelled 18 minutes later auto-
matically)
The test run is started by pressing timer cancel button
five times continuously. (Room type)
To cancel the test run, press any button.
3) Settlement of outdoor unit
Anchor the outdoor unit with a bolt and nut(
ø
10mm)
tightly and horizontally on a concrete or rigid mount.
When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.
In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.
4) Evaluation of the performance
Operate unit for 15~20 minutes, then check the system
refrigerant charge:
1. Measure the pressure of the gas side service valve.
2. Measure the temperature of the intake and discharge of
air.
3. Ensure the difference between the intake temperature
and the discharge is more than 8
°
C(46
°
F) (Cooling) or
reversely (Heating).
Bolt
Tubing connection
Discharge
temperature
Discharge air
Intake temperature
Test Running
Split, Art Cool Type
Discharge
temperature
Discharge air
Intake temperature
R-410A
35
°
C (95
°
F)
8.5~9.5kg/cm
2
G(120~135 P.S.I.G.)
Outside ambient
TEMP.
Refrigerant
The pressure of the gas side
service valve.
Test Running