LG LSC121PMA Service Manual - Page 29

Soap water method

Page 29 highlights

Soap water method (1) Remove the caps from the 2-way and 3-way valves. (2) Remove the service-port cap from the 3-way valve. (3) To open the 2-way valve turn the valve stem coun- terclockwise approximately 90°, wait for about 2~3 sec, and close it. (4) Apply a soap water or a liquid neutral detergent on the indoor unit connection or outdoor unit connections by a soft brush to check for leakage of the connecting points of the piping. (5) If bubbles come out, the pipes have leakage. 3-way valve (Close) 2-way valve (Open) 3. Evacuation • Connect the charge hose end described in the preceding steps to the vacuum pump to evacuate the tubing and indoor unit. Confirm the "Lo" knob of the manifold valve is open. Then, run the vacuum pump. The operation time for evacuation varies with tubing length and capacity of the pump. The following table shows the time required for evacuation. Required time for evacuation when 30 gal/h vacuum pump is used If tubing length is less than 10m if tubing length is longer than 10m (33 ft) (33 ft) 10 min. or more 15 min. or more • When the desired vacuum is reached, close the "Lo" knob of the manifold valve and stop the vacuum pump. Gas side Liquid side Cap Hexagonal wrench Indoor unit Outdoor unit 4. Finishing the job • With a service valve wrench, turn the valve stem of liquid side valve counter-clockwise to fully open the valve. • Turn the valve stem of gas side valve counter-clockwise to fully open the valve. • Loosen the charge hose connected to the gas side service port slightly to release the pressure, then remove the hose. • Replace the flare nut and its bonnet on the gas side service port and fasten the flare nut securely with an adjustable wrench. This process is very important to prevent leakage from the system. • Replace the valve caps at both gas and liquid side service valves and fasten them tight. This completes air purging with a vacuum pump. The air conditioner is now ready to test run. -29- Manifold valve Pressure gauge Lo Hi Open Close Vacuum pump

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63

-29-
3. Evacuation
• Connect the charge hose end described in the pre-
ceding steps to the vacuum pump to evacuate the tub-
ing and indoor unit.
Confirm the "Lo" knob of the manifold valve is open.
Then, run the vacuum pump.
The operation time for evacuation varies with tubing
length and capacity of the pump. The following table
shows the time required for evacuation.
• When the desired vacuum is reached, close the "Lo"
knob of the manifold valve and stop the vacuum
pump.
4. Finishing the job
• With a service valve wrench, turn the valve stem of
liquid side valve counter-clockwise to fully open the
valve.
• Turn the valve stem of gas side valve counter-clock-
wise to fully open the valve.
• Loosen the charge hose connected to the gas side
service port slightly to release the pressure, then
remove the hose.
• Replace the flare nut and its bonnet on the gas side
service port and fasten the flare nut securely with an
adjustable wrench. This process is very important to
prevent leakage from the system.
• Replace the valve caps at both gas and liquid side
service valves and fasten them tight.
This completes air purging with a vacuum pump.
The air conditioner is now ready to test run.
(1) Remove the caps from the 2-way and 3-way
valves.
(2) Remove the service-port cap from the 3-way valve.
(3) To open the 2-way valve turn the valve stem coun-
terclockwise approximately 90°, wait for about 2~3
sec, and close it.
(4) Apply a soap water or a liquid neutral detergent on
the indoor unit connection or outdoor unit connec-
tions by a soft brush to check for leakage of the
connecting points of the piping.
(5) If bubbles come out, the pipes have leakage.
Soap water method
Required time for evacuation when 30 gal/h vacuum pump is
used
10 min. or more
15 min. or more
If tubing length is less than 10m
(33 ft)
if tubing length is longer than 10m
(33 ft)
Gas side
Liquid side
Cap
Hexagonal wrench
2-way valve
(Open)
3-way valve
(Close)
Indoor unit
Outdoor unit
Lo
Hi
Manifold valve
Vacuum pump
Pressure
gauge
Open
Close