LG LSC121PMA Service Manual - Page 37

Pumping down

Page 37 highlights

2. Pumping down Indoor unit Liquid side Open 2-Way valve Outdoor unit Gas side Closed 3-Way valve Lo CLOSE CLOSE Purge the air • Procedure (1) Confirm that both the 2-way and 3-way valves are set to the open position. - Remove the valve stem caps and confirm that the valve stems are in the raised position. - Be sure to use a hexagonal wrench to operate the valve stems. (2) Operate the unit for 10 to 15 minutes. (3) Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way valve. - Connect the charge hose with the push pin to the service port. (4) Air purging of the charge hose. - Open the low-pressure valve on the charge set slightly to air purge from the charge hose. (5) Set the 2-way valve to the closed position. (6) Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 1kg/cm2g. (7) Immediately set the 3-way valve to the closed position. - Do this quickly so that the gauge ends up indicating 3 to 5kg/cm2g. (8) Disconnect the charge set, and mount the 2way and 3-way valve's stem nuts and the service port nut. - Use torque wrench to tighten the service port nut to a torque of 1.8 kg.m. - Be sure to check for gas leakage. -37-

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63

2. Pumping down
• Procedure
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.
– Remove the valve stem caps and confirm that
the valve stems are in the raised position.
Be sure to use a hexagonal wrench to operate
the valve stems.
(2)
Operate the unit for 10 to 15 minutes.
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
– Connect the charge hose with the push pin to
the service port.
(4)
Air purging of the charge hose.
– Open the low-pressure valve on the charge set
slightly to air purge from the charge hose.
(5)
Set the 2-way valve to the closed position.
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
– Do this quickly so that the gauge ends up
indicating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valve’s stem nuts and the
service port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
-37-