Toshiba MW27F51 Service Manual - Page 27
: LOADING GEAR S/T UNIT Refer to Fig. 2-15-A
View all Toshiba MW27F51 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
DISASSEMBLY INSTRUCTIONS 2-13: CAPSTAN DD UNIT (Refer to Fig. 2-13) 1. Remove the Capstan Belt. 2. Remove the screw 1. 3. Remove the Capstan Holder. 4. Remove the 3 screws 2. 5. Remove the Capstan DD Unit. NOTE 1. In case of the Pinch Roller Cam and Main Cam installation, install them as the circled section of Fig. 2-14-B so that the each markers are met. (Refer to Fig. 2-14-B) And also can be seen the Main Chassis hole through the Main Cam maker hole. Capstan Belt 1 Capstan Holder Capstan DD Unit Pinch Roller Cam Marker Main Cam 2 22 • Screw Torque: 4 ± 0.5kgf•cm Fig. 2-13 2-14: MAIN CAM/PINCH ROLLER CAM/JOINT GEAR (Refer to Fig. 2-14-A) 1. Remove the E-Ring 1, then remove the Main Cam. 2. Remove the E-Ring 2, then remove the Pinch Roller Cam and Joint Gear. 1 Main Cam 2 Pinch Roller Cam Joint Gear Fig. 2-14-B 2-15: LOADING GEAR S/T UNIT (Refer to Fig. 2-15-A) 1. Remove the E-Ring 1 and remove the Main Loading Gear. 2. Remove the Main Rod, Tension Lever, Loading Arm S Unit and Loading Arm T Unit. Main Rod Tension Lever 1 Main Loading Gear Loading Arm T Unit Loading Arm S Unit Fig. 2-15-A Fig. 2-14-A B2-5