Toshiba MW27F51 Service Manual - Page 31

Traverse Holder/insulator F/insulator, R Refer To Fig. 3-6-a, Switch Pcb Ass'y/middle Gear/feed

Page 31 highlights

DISASSEMBLY INSTRUCTIONS NOTE 1. In case of the Clamper Ass'y installation, install correctly as Fig. 3-5-B. Clamper Plate Clamper No gap 3-7: SWITCH PCB ASS'Y/MIDDLE GEAR/FEED MOTOR (Refer to Fig. 3-7-A) 1. Remove the screw 1. 2. Remove the Switch PCB Ass'y. 3. Unlock the support 2. 4. Remove the Middle Gear. 5. Remove the 2 screws 3. 6. Remove the Feed Motor. 7. Remove the Motor Gear. Fig. 3-5-B 3-6: TRAVERSE HOLDER/INSULATOR (F)/INSULATOR (R) (Refer to Fig. 3-6-A) 1. Remove the Traverse Holder. 2. Remove the 2 Insulator (F). 3. Remove the Insulator (R). Main Chassis Ass'y Insulator (R) Insulator (F) Traverse Holder Insulator (F) Fig. 3-6-A NOTE 1. In case of the Insulator (F) installation, install correctly as Fig. 3-6-B. 2. In case of the Insulator (R) installation, install correctly as Fig. 3-6-C. Insulator (F) 1 Switch PCB Ass'y Middle Gear 33 2 Main Chassis Ass'y • Screw Torque: 3.0 ± 0.3kgf•cm (Screw 1) • Screw Torque: 1.5 ± 0.3kgf•cm (Screw 3) Motor Gear Feed Motor Fig. 3-7-A NOTE 1. In case of the Motor Gear installation, check if the value of the Fig. 3-7-B is correct. 2. When installing the wire of the Switch PCB Ass'y, install it correctly as Fig. 3-7-C. 3. After the assembly of the Main Chassis Ass'y, hook the wire on the Main Chassis Ass'y as shown Fig. 3-7-D. Motor Gear Feed Motor 6.0 ± 0.2mm Traverse Holder Fig. 3-6-B Insulator (R) Main Chassis Ass'y (Top Side) Fig. 3-6-C Safety surface for pressing of the insert. Fig. 3-7-B • Install wire from (1) to (4) in order. ~ SPINDLE MOTOR ~ YELLOW (2) GREEN (1) ~ FEED MOTOR ~ ORANGE (4) BLUE (3) B3-3 Switch PCB Ass'y Fig. 3-7-C

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110

DISASSEMBLY INSTRUCTIONS
B3-3
Traverse Holder
Insulator (F)
Main Chassis Ass'y
Insulator (F)
Insulator (R)
NOTE
1.
In case of the Clamper Ass'y installation, install correctly
as Fig. 3-5-B.
Fig. 3-5-B
No gap
Clamper Plate
Clamper
3-6:
Remove the Traverse Holder.
Remove the 2 Insulator (F).
Remove the Insulator (R).
1.
2.
3.
Fig. 3-6-A
TRAVERSE HOLDER/INSULATOR (F)/INSULATOR
(R) (Refer to Fig. 3-6-A)
NOTE
1.
2.
In case of the Insulator (F) installation, install correctly as
Fig. 3-6-B.
In case of the Insulator (R) installation, install correctly as
Fig. 3-6-C.
Fig. 3-6-B
Traverse Holder
Insulator (F)
~ FEED MOTOR ~
ORANGE (4)
BLUE (3)
~ SPINDLE MOTOR ~
YELLOW (2)
GREEN (1)
Fig. 3-6-C
Insulator (R)
Main Chassis Ass'y (Top Side)
3-7:
Remove the screw
1
.
Remove the Switch PCB Ass'y.
Unlock the support
2
.
Remove the Middle Gear.
Remove the 2 screws
3
.
Remove the Feed Motor.
Remove the Motor Gear.
1.
2.
3.
4.
5.
6.
7.
SWITCH PCB ASS'Y/MIDDLE GEAR/FEED MOTOR
(Refer to Fig. 3-7-A)
Fig. 3-7-A
Main Chassis Ass'y
1
Middle Gear
3
3
Motor Gear
Feed Motor
Fig. 3-7-B
6.0
±
0.2mm
Safety surface for pressing
of the insert.
Feed Motor
Motor Gear
Fig. 3-7-C
Switch PCB Ass'y
• Install wire from (1) to (4) in order.
NOTE
1.
2.
3.
In case of the Motor Gear installation, check if the value
of the Fig. 3-7-B is correct.
When installing the wire of the Switch PCB Ass'y, install it
correctly as Fig. 3-7-C.
After the assembly of the Main Chassis Ass'y, hook the
wire on the Main Chassis Ass'y as shown Fig. 3-7-D.
• Screw Torque: 3.0
±
0.3kgf•cm (Screw
1
)
• Screw Torque: 1.5
±
0.3kgf•cm (Screw
3
)
Switch PCB Ass'y
2